My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-08_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-08-08_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:37 PM
Creation date
8/9/2016 8:58:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/8/2016
Doc Name
Cost Estimate
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR4
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 67 <br /> <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br /> <br />Task description: Collom-Haul Topsoil from TS-25A to temp sp. SS <br />Site: Colowyo Coal Mine Permit Action: PR4 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 501 State: Colorado Abbreviation: None <br />Date: 8/4/2016 County: Moffat Filename: C019-501 <br />User: JHB <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 5,000 Gal. <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA 25 25 <br />Ownership cost/hour: $148.54 NA NA NA $79.03 $26.43 <br />Operating cost/hour: $192.54 NA NA NA $17.29 $10.19 <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA NA NA $0.00 $0.00 <br />Ripper op. cost/hour: NA NA NA NA $0.00 $0.00 <br />Operator cost/hour: $34.24 NA NA NA $35.83 $0.00 <br />Unit Subtotals: $375.32 NA NA NA $132.15 $36.62 <br />Number of Units: 12 0 0 0 1 1 <br />Group Subtotals: Work: $4,503.84 Support: $0.00 Maint: $168.77 <br />Total work team cost/hour: $4,672.61 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 167,387 CCY Swell factor: 1.125 <br />Loose volume: 188,310 LCY <br />Source of estimated volume: Map 23B, 4” mean <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 2,550 lbs/LCY Struck Volume: 24.00 LCY <br />Material description: Earth - Dry packed Heaped Volume: 34.00 LCY <br />Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br />Payload Capacity: 32.00 LCY Adjusted Capacity: 29.00 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.