My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-08_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2016-08-08_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:34 PM
Creation date
8/9/2016 8:42:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
8/8/2016
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Tri-State Generation and Transmission
Permit Index Doc Type
Findings
Email Name
JRS
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />PR-04, Colowyo Coal Mine C1981-019 27 August 2016 <br /> <br />3.3.2 Reclamation Plan <br /> <br />The reclamation plan for Colowyo is found in Sections 2.05.4 and 2.05.5 of the Colowyo PAP <br />(Volume 1 for the East Pit, West Pit, Section 16 Pit, Facilities Area and Gossard Loadout; <br />Volume 12 for South Taylor; and Volume 15 for the Collom permit expansion area). A partial <br />summary of this plan is given here, and more details are in Section B of this findings document. <br /> <br /> <br />Acreage Disturbed and Reclaimed <br /> <br />The following numbers are reported in the 2015 Annual Reclamation Report (ARR). <br />Approximately 4,777 acres have been disturbed at the Colowyo Mine, but none of this is in the <br />Collom area. Of the disturbed, approximately 2,559 acres have been backfilled and graded, and <br />approximately 2,445 acres have been topsoiled and seeded. These numbers include the 979.5 <br />acres that have been Phase III released (SL-05). <br /> <br /> <br />Roads, Ponds and Support Facilities <br /> <br />To provide access in the area for ranching purposes, the main Collom Haul Road from the <br />Gossard Loadout to the Collom Facilities area may be left in place after mining is complete. <br />Colowyo, as the land owner, will have to provide the Division with a letter documenting this <br />request, at the appropriate time, as stated in Volume 15, Rule 4. <br /> <br />All sediment control ponds and diversion ditches are to be removed during final reclamation of <br />the site. To support the proposed post-mining land use, small water impoundments (stock tanks) <br />will be left to encourage an even distribution of grazing over the reclaimed site and to enhance <br />the areas for wildlife. Water rights associated with these stock tanks will replace the existing <br />water rights associated with the stock ponds that currently exist on the site. <br /> <br />All mine support facilities are to be removed during final reclamation. Drilled holes and <br />underground openings will be closed when no longer needed for mine operations. <br /> <br />Backfilling and Grading <br /> <br />All highwalls will be eliminated. Spoil will be graded to slopes no steeper than three horizontal <br />to one vertical. Reconstructed stream gradients will approximate those of the pre-mining streams, <br />and stream channels will be restructured to complement regional stream patterns. Contour <br />furrows will be constructed to reduce erosion. Overall, Colowyo's reclamation plan will serve to <br />achieve contemporaneous reclamation and AOC. However, a variance to Rule 4.14.1(1)(c) was <br />granted during the initial permitting process to backfill as contemporaneously as practical in lieu
The URL can be used to link to this page
Your browser does not support the video tag.