My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-08_PERMIT FILE - M2009082
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009082
>
2016-08-08_PERMIT FILE - M2009082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 1:48:30 PM
Creation date
8/8/2016 2:01:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009082
IBM Index Class Name
Permit File
Doc Date
8/8/2016
Doc Name
General Correspondence
From
Martin Marrietta
To
DRMS
Email Name
PSH
BJC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br /> Reclamation Costs <br /> The attached spreadsheet represents the estimated cost for the Division to reclaim Parsons Mine, <br /> based on an estimated 100 acres of disturbance during the mining of Phase 2 as detailed in the <br /> Mining Plan Exhibit C. During the life of the mine, approximately 296 of the 381 acres will be <br /> disturbed by the mining activities. Of that area, approximately 60.0 acres will be covered with <br /> water once reclamation is complete. <br /> This site will be mined and reclaimed concurrently. There is an eagle's nest on land adjacent to the <br /> mining site that will impact phasing of the mining and reclamation. The reclamation cost estimate <br /> is based on the time in the process when Phase 1 A will be stripped and operating as the processing <br /> site, Phases 1 B and 1 C will be completely mined and partially reclaimed (due to limitations from <br /> the eagle), and Phase 2 will be stripped, partially mined and partially reclaimed. At this point, <br /> approximately 100 acres will be disturbed and in various stages of mining and reclamation. During <br /> this period, there would be a conveyor crossings over County Road 25 between Phases 1 A and <br /> Phase 2. <br /> Parsons Mine <br /> DRMS 112 Reclamation Permit Application <br /> Page LI ofLI <br />
The URL can be used to link to this page
Your browser does not support the video tag.