My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-08_PERMIT FILE - M2009082
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009082
>
2016-08-08_PERMIT FILE - M2009082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 1:48:30 PM
Creation date
8/8/2016 2:01:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009082
IBM Index Class Name
Permit File
Doc Date
8/8/2016
Doc Name
General Correspondence
From
Martin Marrietta
To
DRMS
Email Name
PSH
BJC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARSONS MINE RECLAMATION COSTS <br /> ITEM I UNIT COST PER UNIT NUMBER OF UNITS TOTAL COST <br /> Direct Cost: Earthmoving and Revs etationt <br /> Grass Seed Mix Acre 5 40.00 100 S 4,000.00 <br /> Drilling Grass Seed Acre $ 18.00 100 $ 1,800.00 <br /> Fertilizer-40#A N&P Acre 2925 100 S 2,925.00 <br /> Fertilizer Application Acre $ 12.50 100 $ 1,250.00 <br /> Top Soiling with Dozer/Loader Cubic Yard S 0.50 130,000 $ 65,000.00 <br /> Disking or Scarifying Acre S 28.50 100 $ 2,850.00 <br /> Weed Control Acre $ 30.00 120 $ 3,600.00 <br /> Back Sloping Cubic Yard $ 0.50 184,000 $ 92,000.00 <br /> Conveyor Removal Linear Foot $ 2.00 1,000 $ 2,000.00 <br /> Conveyor Crossing Removal Lump Sum $ 5.000.00 1 $ 5,000.00 <br /> Mobilization & Demobilization Lump Sum S 2.500.00 1 $ 2,500.00 <br /> Dewatering Lump Sum $ 10,000.00 1 $ 10,000.00 <br /> Plantings Lume Sum S 50,000 00 1 $ 50,000.00 <br /> Total Direct Reclamation Cost O.R.C.) $ 242,925.00 <br /> ITEM 1PERCE7 OF D.R.C.I COST <br /> Indirect Cost: Overhead&Profit <br /> Public Liability Insurance 1 3,755.34 <br /> Contractor Performance Bond 1.55% $ 3,765.34 <br /> Contractor Profit 10.00% S 24,292.50 <br /> DRMS Project Administration Expense 5 0011I S 12.14625 <br /> Total Indirect Reclamation Cast 5 43,969.43 <br /> Per Acre Cost of Reclamation (100 acres) $ 2,868.94 <br /> R:W137_0291DocumentstDRMS 2nd Applicat;on'Appl;cat;on Package'Exh;b!t LtExhibit L Rec Cost Estimate.xls 10/15/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.