Laserfiche WebLink
_f <br /> Transit Mix Concrete Co. <br /> Access Road Stability <br /> Objector Comment: The Transit Mix Quarry application did not include a geotechnical evaluation <br /> of geologic hazards, or an evaluation on the stability and maintenance of the Little Turkey Creek <br /> Road. <br /> Response: Transit Mix has included an engineering analysis of the Little Turkey Creek Road with <br /> this permit submittal. The analysis evaluates the condition of the road and culverts and <br /> demonstrates that quarry operations will not impact the road. According to the public <br /> comments, rock falls have occurred along Little Turkey Creek Road. Rock falls and landslides were <br /> previously addressed in this comment response. No other geotechnical instabilities have been <br /> identified by Transit Mix or were mentioned in the public comments. <br /> The stability of the quarry walls and stockpiles is demonstrated in Exhibit 6.5 of the February 19, <br /> 2016 and July 14, 2016 permit submittals. <br /> Overall Impact on the Environment <br /> Objector Comment: The Transit Mix Quarry application does not include an evaluation of the <br /> overall impact on the environment. <br /> Response: The overall impact on the environment is addressed in the multiple exhibits in the <br /> permit application submittals. The impacts to wildlife are discussed in Exhibit H, and the impacts <br /> to vegetation are discussed in Exhibit J. Both exhibits were revised to provide greater detail and <br /> resubmitted in the July 21, 2016 permit submittal. <br /> Incomplete Maps <br /> Objector Comment: The Transit Mix Quarry application includes maps that did not include <br /> nearby structures. <br /> Response: Transit Mix has revised the required maps to include nearby structures, and these <br /> maps are included in the July 21, 2016 permit submittal. <br /> Hitch Rack Ranch Quarry Permit Application M-2016-010 <br /> Responses to Objection Letters <br /> July 28,2016 20 <br />