In the next photo (Photo 22) the only thing left on the Lower Pump Station pad is the two <br /> cement building pads and the three walls of the cinder block structure that were the <br /> foundations of the buildings and the electrical room (MCC). Re-contouring and reclamation <br /> seeding is planned for this pad in the fall of 2016. <br /> s •;;11 <br /> ,► <br /> '41?""*­� <br /> w 76 <br /> a <br /> x <br /> Photo 22 — Test Mine building foundation, Lower Pump Station building foundation and cinder block MCC <br /> structure in June 2016. The cement and block structures will be broken into small sections and incorporated into <br /> the reclamation re-contouring of the pad. This work is planned for fall 2016. <br /> Solvay Chemicals, Inc.. 23 <br /> DRMS Annual Report <br /> July 8, 2016 <br />