My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-11_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-11_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2020 10:52:39 PM
Creation date
7/12/2016 8:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/11/2016
Doc Name
TR78 Corrected
From
Newmont
To
DRMS
Type & Sequence
TR78
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont-Cripple Creek&Victor Gold Mine ?■ <br /> Technical Specification No.02776-1.DOCX ■ <br /> Squaw Gulch VLF <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> B. Quality Control Manuals from the MANUFACTURER for the installation and testing of <br /> the geogrid. <br /> C. Quality Control Certificates from the MANUFACTURER. <br /> 1.4. Quality Assurance <br /> A. All work shall be constructed, monitored, and tested in compliance with the <br /> requirements of the Construction Quality Assurance Plan (Section01400.2). <br /> CONTRACTOR-and MANUFACTURER shall participate in and comply with all items in <br /> these SPECIFICATIONS and requirements of the CQA plan. <br /> B. CONTRACTOR shall ensure that each geogrid MANUFACTURER that supplies materials <br /> to this project has an internal product quality control program that meets <br /> SPECIFICATIONS. <br /> C. Geogrid rolls that do not meet the requirements of this SPECIFICATION will be <br /> rejected. CONTRACTOR shall replace the rejected material with new material that <br /> conforms to the SPECIFICATION requirements, at no additional cost to CC&V. <br /> 1.5. Delivery,Storage,and Handling <br /> A. Packing and Shipping <br /> 1. Labels on each roll delivered to Site shall identify the following. <br /> a. MANUFACTURER's name <br /> b. Product Identification <br /> c. Thickness <br /> d. Roll number <br /> e. Batch or lot number <br /> f. Roll dimensions <br /> 2. CONTRACTOR shall ensure that geogrid rolls are properly loaded and secured to <br /> prevent damage during transit. <br /> 3. CONTRACTOR shall protect geogrid from excessive heat, cold, puncture, cutting, <br /> or other damaging or deleterious conditions. <br /> 4. CONTRACTOR shall ensure personnel responsible for loading, transport, and <br /> unloading of geogrid are fully aware of the consequences of damage to geogrid, <br /> and are familiar with handling and transport constraints imposed by <br /> MANUFACTURER. <br /> 5. Geogrid delivered to the project shall be protected by a relatively impermeable <br /> and opaque protective cover, with individual straps for unloading. <br /> B. Acceptance at Site <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.