Newmont-Cripple Creek&Victor Gold Mine <br /> Technical Specification No.02776-O.DOCX <br /> Squaw Gulch VLF ■ <br /> Project No.475.0106.006 <br /> June 15,2016 <br /> a. Name and purpose of facility, its location, and date of installation. <br /> b. Name of owner, Design Engineer, MANUFACTURER, Fabricator, if applicable, and <br /> name and telephone number of contact at the facility who can discuss the <br /> project. Thickness of geomembrane and surface area of the installed <br /> geomembrane. <br /> c. Type of seaming, patching, and tacking equipment. <br /> d. A copy of the MANUFACTURER's and/or Fabricator's approval letter(s) and/or <br /> license(s), if applicable. <br /> B. CONTRACTOR shall provide the following information after contract award but within <br /> ten (10) days prior to geomembrane arrival on-site and prior to commencement of the <br /> Work: <br /> 1. A copy of each of the Quality Control Certificates on each lot of resin issued by the <br /> resin Supplier for the specific material for this project including certification of the <br /> resin for extrusion welding. <br /> 2. The results of Quality Control testing conducted by the MANUFACTURER on the resin <br /> used in manufacturing the specific material for this project. <br /> 3. A listing that correlates the resin to the individual geomembrane rolls and welding <br /> rods. <br /> 4. A copy of the geomembrane roll Quality Control Certificates. These certificates shall <br /> be supplied at a minimum frequency of one (1) per every fifty thousand (50,000) <br /> square feet of geomembrane material produced. These certificates shall be issued <br /> only for the individual geomembrane rolls sampled and tested by the <br /> MANUFACTURER or its representative. The certificates will contain test results of <br /> properties outlined in Article 2.01 of this Section. MANAGER reserves the right to <br /> refuse use of any geomembrane supplied without the proper quality control <br /> documentation at no cost to CC&V. <br /> 5. A detailed list of performance criteria for the geomembrane material being <br /> produced for this project. (Note: Performance criteria are sometimes referred to as <br /> "minimum property values." Refer to Articles 2.01 and 2.02 of this Section for <br /> geomembrane properties and Test Methods.) <br /> 6. Resume from the INSTALLER of the Installation Superintendent, Master Seamer, and <br /> Quality Control Inspector to be assigned to the work, including dates and duration of <br /> employment. <br /> 7. Certification from the INSTALLER that both the Installation Supervisor, Quality <br /> Control Inspector, and Master Seamer have reviewed the SPECIFICATIONS, <br /> Construction Quality Assurance Plan, and the DRAWINGS. <br /> 8. A panel layout drawing showing the proposed installation layout identifying field <br /> seams and including areas such as sumps, trenches and pipe penetrations as well as <br /> any variance or additional details that deviate from the DRAWINGS. The layout shall <br /> Page 2 <br />