My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-11_PERMIT FILE - P2016015 (4)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2016015
>
2016-07-11_PERMIT FILE - P2016015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2020 10:35:06 PM
Creation date
7/11/2016 2:47:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016015
IBM Index Class Name
Permit File
Doc Date
7/11/2016
Doc Name
Updated Application - Form 2
From
DRMS
To
AuPt Industries LLC
Email Name
ACY
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 1 -All information for DRMS use and confidential filing) <br /> 3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> Topsoil is approximately 10 inches of depth. Topsoil on affected areas will be stockpiled on <br /> previously disturbed area a saved for reclamation. Topsoil will be used to cap reclaimed <br /> sai id. <br /> 4. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> 5. Describe how portals,adits, shafts,ponds, excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> Ponds will be located on previously disturbed areas. These will be reclaimed and leveled. <br /> Pond iner removed and disposedof. blope ot reclaimed areas are between 0 - 5 degrees <br /> with face, of reclaimed area adjacent to disturbed area will be approximately 30 degrees. <br /> 6. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> No roads will be created in this effort. <br />
The URL can be used to link to this page
Your browser does not support the video tag.