Laserfiche WebLink
6 (FORM 1 -All information for DRMS use and confidential filing) <br /> 3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> Topsoil is approximately 10 inches of depth. Topsoil on affected areas will be stockpiled on <br /> previously disturbed area a saved for reclamation. Topsoil will be used to cap reclaimed <br /> sai id. <br /> 4. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> 5. Describe how portals,adits, shafts,ponds, excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> Ponds will be located on previously disturbed areas. These will be reclaimed and leveled. <br /> Pond iner removed and disposedof. blope ot reclaimed areas are between 0 - 5 degrees <br /> with face, of reclaimed area adjacent to disturbed area will be approximately 30 degrees. <br /> 6. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> No roads will be created in this effort. <br />