Laserfiche WebLink
7 (FORM 2 -Public filing) <br /> 12. List the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br /> PLS/acre. For assistance with formulating seed mixtures and rates, contact the local NRCS if on private land, BLM/USFS if <br /> on public land or State Land Board if on state land. <br /> A. Provide plant name and seeding rate <br /> Plant Name Seeding Rate(PLS/acre) <br /> Aristida purpurea 1 .50 <br /> Hilaria jamesii 1 .50 <br /> Sporobolus cryptandrus 1 .50 <br /> B. Describe the method for seed bed preparation,and application method for grass/forb seeding: <br /> Disturbed areas will be re-capped with existing topsoil. Area will be hand raked and <br /> seed mix will be hand sowed. No fertilizer or mulching will be used. No interim <br /> seeding will take place due to the short duration of the project. State Land Board <br /> dues not have specific iedaination guidelines. <br /> V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br /> 3. Reclamation measures shall be fulfilled in a timely manner and completed within five(5)years of completion of prospecting <br /> activities. <br /> 4. The prospecting operations described in this Notice will be conducted in such a manner as to minimize surface disturbances. <br /> In addition to the measures required in Rule 5,precautions to be taken include: <br /> A. Confinement of operations to areas near existing roads or trails,where practicable. Existing roads which are to remain as <br /> permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre- <br /> prospecting condition; <br /> B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br /> stream channel. Drill cuttings must be spread to a depth no greater than one-half(1/2) inch or buried in an approved <br /> disposal pit; <br />