My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-15_HYDROLOGY - M1999051
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999051
>
2016-04-15_HYDROLOGY - M1999051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:50 PM
Creation date
7/5/2016 2:23:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999051
IBM Index Class Name
Hydrology
Doc Date
4/15/2016
Doc Name
Submission of Information Requested for Monitoring Well
From
Daub & Associates
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A: Well Design: <br />See Well Bore Diagram in Appendix E. <br />Rig Equipment <br />• Rotary Drill Rig <br />Completion Equipment <br />• —90' of 7.625" OD x 6.96" ID 26.4# J-55 conductor casing and centralizers. (min. of 40 <br />feet into bedrock) <br />•1734' 4.5" OD x 4.0" ID 11.6# J-55 LT&C (Intermediate Casing) and centralizers. <br />• --1800' feet of drill pipe. <br />• 9.750" rotary bit and BHA <br />• 6.5" (tri -cone) rotary bit and subs. <br />• 4.0" rotary bit and subs <br />Surface Equipment <br />• Mixer for cement <br />• Light Plants <br />• 400 bbl water tank <br />• Trash Bin (NS) <br />• Porta -Potty <br />• Mud tank <br />• Adequate mud pump <br />• Fuel Storage <br />Directional Plan <br />There is not a Directional Plan for this well. A Deviation log will be run during open hole logging to <br />determine final well bore trajectory. <br />Pre Drilling Operations Notes: <br />1. Perform a rig and location inspection before starting operations. <br />2. All water used for drilling and coring operations should be from an approved NS water source. <br />Daub & Associates, Inc. Page 8 of 12 Printed: 4/5/2016 <br />Revision Number Lo <br />Revision <br />Date <br />By Page(s) <br />Approval <br />Remarks <br />0 <br />12/16/15 <br />Garrett Mitchell All <br />N/A <br />Draft <br />1 <br />3/25/16 <br />Garrett Mitchell All <br />N/A <br />Draft <br />2 <br />4/1/16 <br />R. G. Dean All <br />N/A <br />Draft Review <br />3 <br />4/1/16 <br />G.J. Daub All <br />N/A <br />Edit/Update/Revise <br />Appendix A: Well Design: <br />See Well Bore Diagram in Appendix E. <br />Rig Equipment <br />• Rotary Drill Rig <br />Completion Equipment <br />• —90' of 7.625" OD x 6.96" ID 26.4# J-55 conductor casing and centralizers. (min. of 40 <br />feet into bedrock) <br />•1734' 4.5" OD x 4.0" ID 11.6# J-55 LT&C (Intermediate Casing) and centralizers. <br />• --1800' feet of drill pipe. <br />• 9.750" rotary bit and BHA <br />• 6.5" (tri -cone) rotary bit and subs. <br />• 4.0" rotary bit and subs <br />Surface Equipment <br />• Mixer for cement <br />• Light Plants <br />• 400 bbl water tank <br />• Trash Bin (NS) <br />• Porta -Potty <br />• Mud tank <br />• Adequate mud pump <br />• Fuel Storage <br />Directional Plan <br />There is not a Directional Plan for this well. A Deviation log will be run during open hole logging to <br />determine final well bore trajectory. <br />Pre Drilling Operations Notes: <br />1. Perform a rig and location inspection before starting operations. <br />2. All water used for drilling and coring operations should be from an approved NS water source. <br />Daub & Associates, Inc. Page 8 of 12 Printed: 4/5/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.