Laserfiche WebLink
Tabetha Lynch, DRMS <br />Page 4 <br />June 17, 2016 <br /> <br /> <br />Reclamation Cost Estimate <br /> <br />The current required surety for the Trapper Mine is set at $23,016,528.92. Enclosed is the <br />CIRCES cost estimate for TR115. Based on this estimate the liability will need to increase by <br />$586,438.57 for a total liability of $23,602,967.49. The current bond held for the site is <br />$23,400,000.00. Trapper will need to increase their financial warranty by $202,967.49.