Laserfiche WebLink
150 Replace Topsoil on 10 Right Dewatering Borehole DOZER 1 14.35 $2,192.00 <br />151 Replace Topsoil on Eastern Mining District Vent <br />Shaft Area <br />DOZER 1 95.34 $14,559.00 <br />153 Replace Topsoil on 6 North Main Vent Shaft Pad <br />and Access Ro <br />DOZER 1 58.42 $8,922.00 <br />154 Replace Topsoil on 16 Left Pad and Access Road DOZER 1 8.15 $1,245.00 <br />155 Replace Topsoil on Explorati Drill Pads for Holes <br />TWC001-007 <br />DOZER 1 4.61 $704.00 <br />156 Replace Topsoil on 15 Left Pad and Access Road DOZER 1 9.52 $1,523.00 <br />157 Replace Topsoil on 16LT Pad and Access Road DOZER 1 76.26 $15,263.00 <br />158 Replace Topsoil on 6 North Main Reservoir <br />Disturbances <br />DOZER 1 113.80 $22,776.00 <br />159 Replace Topsoil on Northwest Mains Vent Pad DOZER 1 7.51 $1,502.00 <br />160 Replace Topsoil on Explorati Drill Pads for Holes <br />TCW008-012 <br />DOZER 1 2.41 $481.00 <br />161 Replace Topsoil on Thickener Underflow Borehole <br />Area <br />DOZER 1 4.25 $850.00 <br />162 Replace Topsoil on Refuse Clay Pile Staging Area <br />OSP-1 <br />DOZER 1 15.99 $3,201.00 <br />163 Replace Topsoil on 19 Right Pad and Pipeline <br />Corridor <br />DOZER 1 24.21 $4,845.00 <br />164 Replace Topsoil on 18 Left Pipeline Corridor DOZER 1 24.11 $4,826.00 <br />165 Replace Topsoil on 18 Left Pad and Access Road DOZER 1 44.22 $8,851.00 <br />166 Replace Topsoil on 18 Right Pad LOADER 1 15.82 $2,009.00 <br />167 Replace Topsoil, DrillPad/MudPit; EMD Water <br />Mon. Wells M267 <br />DOZER 1 0.98 $204.00 <br />168 Replace Topsoil on Access Roads; EMD Water <br />Mon. Wells MR267 <br />DOZER 1 1.42 $297.00 <br />169 Replace Topsoil, Roads/Pads; TRO Coal Qual. <br />Coreholes MR269 <br />DOZER 1 2.89 $602.00 <br />170 Replace Topsoil; 7RT Thickener BH Pad/Pipeline <br />Corr.; MR270 <br />DOZER 1 4.08 $851.00 <br />171 Topsoil Drill Pads/Access Roads TRO Coal Q. <br />Coreholes 5-10 <br />DOZER 1 12.54 $2,615.00 <br />172 Topsoil Drill Pads/Acccess Road; WCR Coreholes <br />MR275 <br />DOZER 1 2.41 $502.00 <br />173 Replace Topsoil on Drill Pads and Acccess Road DOZER 1 23.54 $4,909.00 <br />174 Topsoil Drill Pad/Additional Dist. WCR Sup. <br />Coreholes MR277 <br />DOZER 1 42.00 $8,759.00 <br />175 Topsoil Drill Pads/Access Road; WCR Sup. <br />Coreholes MR278 <br />DOZER 1 16.05 $3,347.00 <br />176 Topsoil Drill Pads/Access Road; WCR Offset <br />Drilling; MR280 <br />DOZER 1 43.61 $9,093.00 <br />177 Topsoil from Stockpile to Drill Pad; 5MN <br />Borehole MR283 <br />DOZER 1 1.66 $418.00 <br />178 Topsoil from Stockpile to Light-Use Road; 5MN <br />Borehole MR283 <br />DOZER 1 2.32 $586.00 <br />179 Topsoil on Drill Pad; 10 East Mid Panel BH; <br />MR289 <br />DOZER 1 6.33 $1,321.00 <br />180 Replace Topsoil on New CRDA Access Road; <br />MR290 <br />DOZER 1 3.25 $815.00 <br />180a Replace Topsoil on 13LT Utility Borehole Pad and <br />Road; MR291 <br />SCRAPER1 1 8.41 $7,871.00 <br />180b Topsoil replacement, geotechnical test-pits, <br />MR295 <br />EXCAVATE 1 2.66 $177.00 <br />180c Replace Topsoil on 9E Borehole Pad and Road <br />(MR296) <br />DOZER 2 7.38 $4,929.00