My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-14_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2016-06-14_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:34 PM
Creation date
6/15/2016 10:14:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
6/14/2016
Doc Name
Update Cost Estimate from Informal Conference
From
DRMS
To
Twentymile Coal Company
Type & Sequence
SI2
Email Name
JLE
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
098 Regrade Access Roads; TRO Coal Quality <br />Coreholes 5-10, MR272 <br />DOZER 1 19.44 $4,054.00 <br />099 Regrade Light-Use Road; 5MN Borehole MR283 DOZER 1 6.96 $1,757.00 <br />100 Rip New CRDA Topsoil Stockpile Access Road; <br />MR290 <br />RIPPER 1 0.82 $211.00 <br />100a Regrade 13LT Outby Utility Borehole Road Area; <br />MR291 <br />DOZER 2 7.74 $3,245.00 <br />100b Rip and Regrade 9 East Utility Borehole Road <br />(MR296) <br />DOZER 2 3.03 $2,043.00 <br /> Earthwork – Drainage Control <br />101 Regrade Ditch D-3 DOZER 1 29.24 $2,220.00 <br />102 Regrade Ditch E-1 DOZER 1 12.63 $959.00 <br />103 Regrade Ditch F-1 and Pond F Ditches DOZER 1 21.26 $1,614.00 <br />104 Regrade Ditches G-1a, G-1b, G-1c, and Million <br />Gallon Tank No <br />DOZER 1 25.90 $1,966.00 <br />105 Regrade Ditch G-4 DOZER 1 19.27 $1,463.00 <br />106 Regrade West Rail Loop Diversion Ditch DOZER 1 2.15 $163.00 <br />110 Backfill and Regrade Pond B DOZER 1 7.61 $2,427.00 <br />111 Backfill and Regrade Pond C DOZER 1 19.94 $6,364.00 <br />112 Backfill and Regrade Pond D DOZER 1 22.43 $7,159.00 <br />113 Backfill and Regrade Pond E DOZER 1 17.45 $5,568.00 <br />114 Backfill and Regrade Pond F DOZER 1 27.57 $8,799.00 <br />115 Backfill and Regrade Pond G DOZER 1 34.46 $10,999.00 <br />116 Backfill and Regrade Pond T DOZER 1 2.44 $779.00 <br />117 Backfill and Regrade 6 North Main Holding Pond <br />Embankments, <br />DOZER 1 35.97 $11,480.00 <br />118 Backfill and Regrade 18 Left Vent Shaft Ponds DOZER 1 8.10 $2,586.00 <br /> Earthwork- Topsoil <br />130 Replace Topsoil at Portal Surface Area SCRAPER1 2 38.43 $77,414.00 <br />131 Replace Topsoil at Office/Bathouse SCRAPER1 2 39.54 $79,647.00 <br />132 Replace Topsoil at Parking Lot and Laydown Area SCRAPER1 2 51.83 $104,411.00 <br />133 Replace Topsoil at Stoker Coal Loading Area SCRAPER1 1 1.29 $1,636.00 <br />134 Replace Topsoil at Refuse Area, Refuse Area <br />Expansion Phase <br />SCRAPER1 3 203.00 $612,402.00 <br />135 Replace Topsoil on Haulroad B SCRAPER1 1 62.69 $95,017.00 <br />136 Replace Topsoil on Fish Creek Borehole Area and <br />Road <br />SCRAPER1 1 9.72 $14,734.00 <br />137 Replace Topsoil on Explosives Storage Area SCRAPER1 1 4.54 $5,731.00 <br />138 Replace Topsoil on Truck Loadout and Haulroad C SCRAPER1 1 55.72 $70,419.00 <br />139 Replace Topsoil on Pond E and Haulroad B SCRAPER1 1 4.00 $5,049.00 <br />140 Replace Topsoil on Pond E Relocation Area SCRAPER1 1 9.45 $11,947.00 <br />141 Replace Topsoil on Batch /Weigh Loadout <br />Stockpile Area <br />SCRAPER1 1 3.91 $4,941.00 <br />142 Replace Topsoil on 18 Right West Portion Access <br />Road <br />SCRAPER1 1 3.23 $3,452.00 <br />143 Replace Topsoil on 18 Right East Central Portion <br />Access Road <br />SCRAPER1 1 2.03 $2,169.00 <br />144 Replace Topsoil on 18 Right Northeast Portion <br />Access Road <br />SCRAPER1 1 0.60 $639.00 <br />145 Replace Topsoil on West Haulroad SCRAPER1 1 0.63 $669.00 <br />146 Replace Cover Material on Refuse Disposal Area SCRAPER1 3 154.21 $465,228.00 <br />147 Replace Topsoil on Main Facilities <br />Access/Haulroad Area <br />SCRAPER1 1 7.00 $10,613.00 <br />148 Haul and Replace Topsoil to Fish Creek Tipple TRUCK1 1 31.01 $39,035.00 <br />149 Haul and Replace Topsoil to "Trudy's Corner" <br />Laydown Area <br />TRUCK1 1 12.46 $15,685.00
The URL can be used to link to this page
Your browser does not support the video tag.