Laserfiche WebLink
Portal/Shaft Sealing <br />181 Seal Shafts and Openings MINESEAL 1 196.15 $71,372.82 <br /> Drillhole/Monitoring Well Sealing <br />182 Borehole and Monitoring Well Sealing BOREHOLE 1 1,678.42 $700,674.37 <br />183 Plug and Seal the 9 East Utility Borehole (MR296) BOREHOLE 1 16.00 $34,897.57 <br /> Revegetation and Reseeding <br />185 Rangeland Area Seeding; All approved <br />disturbances <br />REVEGE 1 327.99 $611,436.00 <br /> Structure Demolition and Removal <br />190 Demolish and Remove All Structures DEMOLISH 1 4,100.00 $2,798,394.03 <br /> Equipment Mobilization/Demobilization <br />200 Mobilize/Demobilize Equipment from Hayden, <br />Colorado <br />MOBILIZE 1 3.37 $47,832.00 <br /> Miscellaneous Reclamation Tasks <br />210 Site Maintenance During Reclamation and Ten- <br />Year Liability <br />SITEMAINT <br />ENANCE <br />1 300.00 $75,781.89 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />11320.19 <br /> <br />$8,054,784 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $162,706.64 <br />Performance bond: 1.05 Total = $84,575.23 <br />Job superintendent: 3,736.00 Total = $278,257.28 <br />Profit: 10.00 Total = $805,478.40 <br /> TOTAL O & P = $1,331,017.55 <br /> CONTRACT AMOUNT (direct + O & P) = $9,385,801.55 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 4.00 Total = $375,432.06 <br />Reclamation management and/or administration: 3.13 $293,775.59 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $2,000,225.20 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $10,055,009.20 <br /> <br /> <br />