Newmont Mining Corporation S <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,May 28,2016 <br /> for installation of riprap in the Phase 2 Diversion Channel. The attached Figure 1 shows the <br /> subgrade acceptance areas. <br /> 1.4 Leak Detection Trench <br /> Approximately 250 feet of Leak detection trench was constructed above stations H12+50 to <br /> H 15+00. <br /> 1.5 Soil Liner Fill (SLF) <br /> Soil Liner Fill processing continued at the Dump 1 processing plant. Approximately 139,298 dry <br /> tons of material has been processed as of Saturday, May 28, 2016. <br /> 1.6 Drain Cover Fill (DCF) <br /> CAT 740 haul trucks hauled DCF from the stockpile to the Phase 1 VLF. The DCF was placed on <br /> approved geomembrane by two low ground pressure CAT dozers. The attached Figure 2 shows <br /> the area where fill was placed during this reporting period. <br /> 1.7 Riprap <br /> Riprap was installed between stations 53+00 and 54+00 of the Phase 2 Diversion Channel in <br /> accordance with project technical specifications. <br /> 2.0 GEOSYNTHETICS <br /> 2.1 Geogrid <br /> No work performed during this reporting period. <br /> 2.2 Geomembrane <br /> Panels P-1499 through P-1534 and P1635 through P-1715 were accepted for Drain Cover Fill <br /> placement. The attached Figure 3 shows the acceptance areas. <br /> 3.0 STORM WATER MANAGEMENT <br /> Best Management Practices continued to be performed. <br /> Page 3 <br />