My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-08_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-06-08_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2020 10:52:50 PM
Creation date
6/10/2016 9:01:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/8/2016
Doc Name
Weekly CQA - week ending 5/28/2016
From
Newmont / CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation ■ <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,May 28,2016 <br /> 1.0 EARTHWORKS <br /> 1.1 Underground Working Remediation <br /> ➢ Confirmatory drilling was performed to a depth of 50-feet at the upper Anaconda Mine <br /> Complex. NewFields personnel observed drilling activities and noted any voids that were <br /> encountered. Further remediation is required. <br /> An excavator worked to remove the shot rock from the upper Anaconda Mine Complex. <br /> ➢ An excavator worked to backfill UG#6477 per project specifications. The area is being be <br /> prepped for a concrete plug and a geogrid cap. <br /> ➢ An excavator worked to shape the concrete plugs at UG#6477 and UG#6478. <br /> 1.2 Structural Fill <br /> Structural Fill placement continued within the Squaw Gulch VLF Phase II footprint. NewFields <br /> personnel inspected fill material and observed placement and compaction procedures to <br /> ensure that they were in accordance with the project technical specifications. Ambient <br /> temperatures remained above 32 degrees Fahrenheit throughout the shift. The following <br /> structural fill construction activities occurred during the shift: <br /> Slope rough grading (cut to fill) in areas bounded by bench stations: <br /> 0 134+00 to 136+00 and K26+00 to K31+00 <br /> o M27+00 to M32+00 and K35+00 to K40+00 <br /> Slope rough grading (cut to stockpile) in areas bounded by bench stations: <br /> o K14+00 to K16+00 <br /> ➢ Slope rough grading (cut and hauled to fill) in areas bounded by bench stations: <br /> o K23+00 to K26+00 and M19+00 to M21+00 <br /> 0 122+00 to 128+00 and Haul Road <br /> o K34+00 to K40+00 and Haul Road <br /> Fill placement in areas bounded by bench stations: <br /> 0 125+00 to 136+00 and K22+00 to K31+00 <br /> o 534+00 to S46+00 and M30+00 to M40+00 <br /> 1.3 Subgrade <br /> Subgrade acceptance was performed prior to placing SLF material in preparation for the leak <br /> detection trench installation. Subgrade was also accepted between Stations 53+00 and S4+00 <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.