Laserfiche WebLink
Newmont Mining Corporation INN <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,May 28,2016 <br /> 4.0 NEWFIELDS LABORATORY ACTIVITIES <br /> NewFields personnel performed sieve analysis, atterberg limits, compaction and permeability <br /> testing. Two samples of Soil Liner Fill (NFSLF-I8-C and NFSLF-I9-C) were collected from the <br /> Dump 1 Processing Plant. <br /> 5.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the weekly Contractor Planning Meeting (May 24 2016), weekly <br /> Contractor Safety Meeting (May 26, 2016), Ames daily safety meetings and NewFields daily <br /> safety meetings. <br /> 6.0 MISCELLANEOUS, ISSUES AND CONCERNS <br /> An excavator moved the ore haul road on the south west side of the mill platform (between the <br /> 9650' and 9750' benches). The road will be used to haul DCF during this construction season. <br /> The road was moved to the east side of the drain pipeline so that the road did not have to cross <br /> the pipeline. A NewFields representative was present to ensure that the excavator did not dig <br /> into the existing DCF material and damage the geomembrane. <br /> 7.0 PHOTOGRAPHS <br /> ri <br /> May 23, 2016—Survey of Phase 1 HVSC Piping (BM) <br /> Page 4 <br />