My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-08_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-06-08_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2020 10:52:50 PM
Creation date
6/10/2016 9:01:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/8/2016
Doc Name
Weekly CQA - week ending 5/28/2016
From
Newmont / CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation INN <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,May 28,2016 <br /> 4.0 NEWFIELDS LABORATORY ACTIVITIES <br /> NewFields personnel performed sieve analysis, atterberg limits, compaction and permeability <br /> testing. Two samples of Soil Liner Fill (NFSLF-I8-C and NFSLF-I9-C) were collected from the <br /> Dump 1 Processing Plant. <br /> 5.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the weekly Contractor Planning Meeting (May 24 2016), weekly <br /> Contractor Safety Meeting (May 26, 2016), Ames daily safety meetings and NewFields daily <br /> safety meetings. <br /> 6.0 MISCELLANEOUS, ISSUES AND CONCERNS <br /> An excavator moved the ore haul road on the south west side of the mill platform (between the <br /> 9650' and 9750' benches). The road will be used to haul DCF during this construction season. <br /> The road was moved to the east side of the drain pipeline so that the road did not have to cross <br /> the pipeline. A NewFields representative was present to ensure that the excavator did not dig <br /> into the existing DCF material and damage the geomembrane. <br /> 7.0 PHOTOGRAPHS <br /> ri <br /> May 23, 2016—Survey of Phase 1 HVSC Piping (BM) <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.