Laserfiche WebLink
Payload Capacity: 34.58 <br />Truck Bed (volume) Basis: <br />LCY <br />Struck Volume: 15.00 LCY <br />Heaped Volume: 18.00 LCY <br />Average Volume: 16.50 LCY <br />Adjusted Volume: 18.00 LCY <br />Final Truck Volume Based on Number of Loader Passes: 17.81 <br />Loading Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 0.530 LCY (heaped) <br />Bucket Fill Factor: 1.050 Moist loam or sandy clay 100% - 110% 1.050 <br />Adjusted Capacity: 0.557 LCY <br />Job Condition Corrections: Site Altitude (ft.): 7000 feet <br />Page 3 of 6 <br />LCY <br />Net Correction: 0.830 0.830 <br />Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill 32 <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, 0.425 <br />maneuver): <br />passes <br />minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Page 3 of 6 <br />LCY <br />Net Correction: 0.830 0.830 <br />Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill 32 <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, 0.425 <br />maneuver): <br />passes <br />minutes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />No adjustment - factor not applicable 0.00 0.000 <br />(Cat HB) <br />Stockpile: <br />No adjustment - factor not applicable 0.00 0.000 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 0.000 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 -0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 0.000 <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />Net Cycle Time Adjustment: -0.040 <br />minutes <br />Adjusted Loader Cycle Time: 0.385 <br />minutes <br />Net Load Time per Truck: 12.035 <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: <br />0.50 Minutes Adjusted for site altitude: <br />0.500 Minutes <br />Truck Load Time: <br />12.035 Minutes Adjusted for site altitude: <br />12.035 Minutes <br />Truck Maneuver and Dump <br />0.90 Minutes Adjusted for site altitude: <br />0.900 Minutes <br />Time: <br />CIRCES Cost Estimating Software <br />