My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-07_REVISION - C1982056 (8)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2016-06-07_REVISION - C1982056 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:13 PM
Creation date
6/8/2016 7:44:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
6/7/2016
Doc Name
Cost Estimate
From
DRMS
To
Twentymile Coal, LLC
Type & Sequence
MR297
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Payload Capacity: 34.58 <br />Truck Bed (volume) Basis: <br />LCY <br />Struck Volume: 15.00 LCY <br />Heaped Volume: 18.00 LCY <br />Average Volume: 16.50 LCY <br />Adjusted Volume: 18.00 LCY <br />Final Truck Volume Based on Number of Loader Passes: 17.81 <br />Loading Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 0.530 LCY (heaped) <br />Bucket Fill Factor: 1.050 Moist loam or sandy clay 100% - 110% 1.050 <br />Adjusted Capacity: 0.557 LCY <br />Job Condition Corrections: Site Altitude (ft.): 7000 feet <br />Page 3 of 6 <br />LCY <br />Net Correction: 0.830 0.830 <br />Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill 32 <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, 0.425 <br />maneuver): <br />passes <br />minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Page 3 of 6 <br />LCY <br />Net Correction: 0.830 0.830 <br />Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill 32 <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, 0.425 <br />maneuver): <br />passes <br />minutes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />No adjustment - factor not applicable 0.00 0.000 <br />(Cat HB) <br />Stockpile: <br />No adjustment - factor not applicable 0.00 0.000 <br />(Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 0.000 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 -0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 0.000 <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />Net Cycle Time Adjustment: -0.040 <br />minutes <br />Adjusted Loader Cycle Time: 0.385 <br />minutes <br />Net Load Time per Truck: 12.035 <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: <br />0.50 Minutes Adjusted for site altitude: <br />0.500 Minutes <br />Truck Load Time: <br />12.035 Minutes Adjusted for site altitude: <br />12.035 Minutes <br />Truck Maneuver and Dump <br />0.90 Minutes Adjusted for site altitude: <br />0.900 Minutes <br />Time: <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.