Laserfiche WebLink
Page 4 of 6 <br />Truck Travel (Haul & Return) Time: Road Condition: Hard, smooth, stabilized, surfaced, watered, <br />maintained 2.0 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />N <br />(fpm) <br />Time <br />mm <br />1 <br />15840.00 <br />0.00 <br />2.00 <br />2.00 <br />2939 <br />5.559 <br />Haul Time: 5.559 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />N <br />(fpm) <br />Time <br />43.83 <br />LCY/Hour Adjusted for job efficiency: <br />36.38 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />1 <br />15840.00 <br />0.00 <br />2.00 <br />2.00 <br />2960 <br />5.386 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 5.386 <br />minutes <br />Total Truck Cycle Time: 24.380 <br />minutes <br />Loading Tool unit <br />Production <br />85.24 <br />LCY/Hour Adjusted for job efficiency: <br />70.75 LCY/Hour <br />Truck Unit Production <br />43.83 <br />LCY/Hour Adjusted for job efficiency: <br />36.38 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 72.75 <br />LCY/Hour <br />Adjusted single truck/loader team production: 70.75 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 70.75 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 1.72 <br />Hours <br />Unit cost: <br />$3.975 <br />/LCY Total job cost: $485 <br />CIRCES Cost Estimating Software <br />