Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Coal Fines Clean Up <br />Site: Foidel Creek Mine Permit Action: MR297 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 6/17/2016 County: Routt <br />User: JLE <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Truck Loader Team -Truck: Generic 15-18 cy, 6x4 <br />-Loader: CAT 246C <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Permit/Job#: C1982056 <br />Abbreviation: None <br />Filename: C056-001 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Sunnort Fouinment Maintenance F.auinment <br />Total work team cost/hour: $281.25 <br />MATERIAL OUANTITIES <br />Initial volume: 122 CCY Swell factor: 1.000 <br />Loose volume: 122 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety 3" over .3 acres <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1,850 Pounds/LCY <br />Description: Coal - Anthracite, Washed <br />Rated Payload: 63,980 Pounds <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$26.08 <br />$6.88 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$62.59 <br />$14.23 <br />NA <br />NA <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. <br />cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$22.10 <br />$38.60 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$110.77 <br />$59.71 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $281.25 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $281.25 <br />MATERIAL OUANTITIES <br />Initial volume: 122 CCY Swell factor: 1.000 <br />Loose volume: 122 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety 3" over .3 acres <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1,850 Pounds/LCY <br />Description: Coal - Anthracite, Washed <br />Rated Payload: 63,980 Pounds <br />