Laserfiche WebLink
054 Finish Grade Coal Stockpile Area DOZER 4 1.26 $2,739.00 <br />055 Finish Grade Gossard Loadout DOZER 4 0.55 $1,199.00 <br />057 Finish Grade Reclaimed and Narrowed Roads; <br />EP,WP, STP <br />DOZER 4 2.43 $5,273.00 <br />065 Excvt Regraded Areas for PM Drng. Channels <br />(sub. SL7 & 8) <br />EXCAVATE 1 740.70 $113,736.00 <br />070 Regrade Gulch A Pond DOZER 1 30.76 $8,006.00 <br />071 Regrade Prospect Pond DOZER 1 34.19 $8,899.00 <br />072 Regrade Streeter Pond DOZER 1 77.75 $20,234.00 <br />073 Regrade Gossard Loop Pond DOZER 1 2.28 $594.00 <br />074 Regrade Gossard Pond DOZER 1 0.99 $258.00 <br />075 Regrade Sewage and Aeration Pond DOZER 1 12.87 $3,349.00 <br />076 Regrade Stoker Siding Pond DOZER 1 7.52 $1,958.00 <br />077 Regrade Wash Bay Pond DOZER 1 38.23 $9,948.00 <br />078 Regrade Wash Bay Sediment Sump DOZER 1 1.78 $463.00 <br />079 Regrade Work Area Pond DOZER 1 134.18 $34,921.00 <br />080 Regrade Section 16 Pond DOZER 1 43.08 $11,212.00 <br />081 Regrade East Taylor Pond DOZER 1 19.87 $5,171.00 <br />082 Regrade Taylor Pond DOZER 1 7.77 $2,023.00 <br />083 Regrade West Pit Pond DOZER 1 55.40 $14,417.00 <br />084 Regrade Section 28 Pond DOZER 1 64.92 $16,894.00 <br />085 Regrade Section 21 Pond DOZER 1 48.59 $12,646.00 <br />086 Regrade West Taylor Pond DOZER 1 21.38 $5,564.00 <br />090 Remove and Regrade East Collection Ditch EXCAVATE 1 46.00 $7,064.00 <br />091 Remove and Regrade South Collection Ditch EXCAVATE 1 68.17 $10,468.00 <br />092 Remove and Regrade Streeter Ditch EXCAVATE 1 13.56 $2,083.00 <br />093 Remove and Regrade Prospect Collection Ditch EXCAVATE 1 11.52 $1,770.00 <br />094 Remove and Regrade North Facilities Ditch EXCAVATE 1 6.10 $937.00 <br />095 Remove and Regrade Stoker Ditch EXCAVATE 1 5.85 $898.00 <br />096 Remove and Regrade West Side Facilities Ditch EXCAVATE 1 24.42 $3,750.00 <br />097 Remove and Regrade East Taylor Pond Ditch EXCAVATE 1 10.85 $1,667.00 <br />098 Remove and Regrade West Pit Coal Road Ditch EXCAVATE 1 14.24 $2,188.00 <br />099 Remove and Regrade Section 16 Pond Ditch EXCAVATE 1 27.13 $4,167.00 <br />100 Remove and Regrade Section 16 Taylor Ditch EXCAVATE 1 12.89 $1,980.00 <br />101 Remove and Regrade Section 16 Perimeter Ditch EXCAVATE 1 14.92 $2,292.00 <br />102 Remove and Regrade Section 28 Collector Ditch EXCAVATE 1 15.87 $2,437.00 <br />103 Remove and Regrade Section 29 Collector Ditch EXCAVATE 1 22.36 $3,434.00 <br />104 Remove and Regrade Ten Sediment Traps EXCAVATE 1 349.16 $53,615.00 <br />105 Remove and Regrade Six Post-Mining Stock <br />Ponds <br />EXCAVATE 1 52.66 $8,087.00 <br />110 Haul Topsoil from Pile 10A to East Pit TRUCK1 2 2.66 $18,040.00 <br />111 Haul Topsoil from Pile 16A to East Pit TRUCK1 2 30.44 $230,857.00 <br />112 Haul Topsoil from Pile 16B to East Pit TRUCK1 2 9.18 $77,131.00 <br />113 Haul Topsoil from Pile 16B Windrow to East Pit TRUCK1 2 4.30 $32,596.00 <br />114 Haul Topsoil from Pile 4A to West Pit TRUCK1 2 16.79 $127,369.00 <br />115 Haul Topsoil from Pile 15B to West Pit TRUCK1 2 53.93 $409,026.00 <br />116 Haul Topsoil from Pile 15K to West Pit TRUCK1 2 9.05 $75,996.00 <br />117 Haul Topsoil from Pile 16A to West Pit TRUCK1 2 12.68 $96,167.00 <br />118 Haul Topsoil from Pile 16E to West Pit TRUCK1 2 4.52 $34,314.00 <br />119 Haul Topsoil from Windrow 5 to West Pit TRUCK1 2 4.93 $33,387.00 <br />120 Haul Topsoil from Stockpile 16D to Section 16 Pit TRUCK1 2 58.41 $443,001.00 <br />121 Haul Topsoil from Stockpile 16E to South Taylor <br />Pit <br />TRUCK1 2 103.95 $872,982.00 <br />122 Haul Topsoil from New Stockpile South Taylor Pit TRUCK1 2 12.29 $103,174.00 <br />123 Haul Topsoil from Stockpile 15A to Facilities Area TRUCK1 2 18.54 $140,588.00 <br />124 Haul Topsoil from Stockpile 15E to Facilities Area TRUCK1 2 0.41 $2,759.00