My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-07_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-06-07_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:23:12 PM
Creation date
6/7/2016 1:12:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
6/7/2016
Doc Name
Midterm & Cost Estimate
From
Janet Binns
To
Zach Trujillo
Type & Sequence
MT7
Email Name
JHB
ZTT
JRS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
537
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> <br />Task description: Summary of reclamation tasks <br />Site: Colowyo Coal Mine Permit Action: MT7 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 6/3/2016 County: Moffat Filename: C019-000 <br />User: JHB <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Drill and Shoot South Taylor Highwall - Cast Blast <br />(3000 ft) <br />BLASTING 1 879.14 $826,468.00 <br />005 Doze Remaining East Pit Spoil (subtract SL6, SL7 <br />& SL8 vol.) <br />DOZER 4 38.77 $83,964.00 <br />006 Load and Haul Spoil to Final East Pit (Subtract <br />SL6, Sl7 & S <br />TRUCK1 1 48.20 $185,506.00 <br />007 Doze Remaining West Pit Highwall (Subtract SL8 <br />vol.) <br />DOZER 4 111.82 $242,194.00 <br />008 Doze Remaining West Pit Spoil (subtract SL6, SL7 <br />& SL8 vol.) <br />DOZER 4 1,690.08 $3,660,532.00 <br />009 Load and Haul Spoil to West Pit (Subtract SL7 & <br />SL8 vol.) <br />TRUCK1 1 126.14 $485,491.00 <br />010 Doze South Taylor Pit Highwall DOZER 4 95.43 $206,684.00 <br />011 Doze Remaining South Taylor Pit Spoil DOZER 4 312.96 $656,933.00 <br />012 Load and Haul Spoil from ET fill to STP (sub. <br />TR99 vol.) <br />TRUCK1 2 2,907.47 $27,979,105.00 <br />013 Load and Haul Spoil from West Taylor Fill to ST <br />Pit <br />TRUCK1 2 1,556.16 $12,441,085.00 <br />014 Regrade Main Facilities Area DOZER 4 132.65 $287,315.00 <br />015 Regrade Coal Stockpile Area DOZER 4 17.50 $36,728.00 <br />016 Regrade Gossard Loadout DOZER 4 2.36 $4,947.00 <br />025 Rip Remaining West Pit Highwall RIPPER 4 56.42 $122,204.00 <br />026 Rip Remaining South Taylor Pit Highwall RIPPER 4 31.56 $68,362.00 <br />027 Rip Facilities Area RIPPER 4 60.17 $130,336.00 <br />028 Rip Coal Stockpile Area RIPPER 4 10.36 $22,446.00 <br />029 Rip Gossard Loadout RIPPER 4 0.96 $2,091.00 <br />031 Rip Mine Access/Haul Road RIPPER 4 3.14 $6,817.00 <br />032 Rip MR-21 Dragline Walk Road RIPPER 4 4.21 $9,135.00 <br />033 Rip Gossard Loadout Road RIPPER 4 1.26 $2,732.00 <br />040 Narrow Access Road DOZER 4 3.65 $7,657.00 <br />041 Regrade MR-21 Dragline Walk Road DOZER 4 6.31 $13,244.00 <br />042 Regrade Gossard Loadout Road DOZER 4 1.70 $3,577.00 <br />043 Regrade Haul Road West DOZER 4 7.59 $15,927.00 <br />044 Regrade Haul Road North DOZER 4 1.79 $3,757.00 <br />045 Regrade West Side Haul Road DOZER 4 7.64 $16,035.00 <br />050 Finish Grade East Pit SL6, SL7 & SL8 subtracted DOZER 4 0.00 $0.00 <br />051 Finish Grade West Pit (subtract SL6, SL7 & SL8 <br />vol.) <br />DOZER 4 68.37 $148,086.00 <br />052 Finish Grade South Taylor Pit (TR105 Vol.) DOZER 4 110.67 $239,703.00 <br />053 Finish Grade Facilities Area DOZER 4 14.62 $31,675.00
The URL can be used to link to this page
Your browser does not support the video tag.