Laserfiche WebLink
125 Haul Topsoil from Stockpile 15F to Facilities Area TRUCK1 2 1.03 $6,999.00 <br />126 Haul Topsoil from Stockpile 15G to Facilities Area TRUCK1 2 3.17 $24,027.00 <br />127 Haul Topsoil from Stockpile 15H to Facilities Area TRUCK1 2 7.06 $47,762.00 <br />128 Haul Topsoil from Stockpile 15I to Facilities Area TRUCK1 2 1.24 $8,376.00 <br />129 Haul Topsoil from Stockpile Gossard Loadout TRUCK1 2 0.33 $2,221.00 <br />130 Replace 48" of Topsoil on Aspen Study Area TRUCK1 2 9.86 $74,788.00 <br />131 Replace 48" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCK1 2 7.40 $56,088.00 <br />132 Replace 4" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCK1 2 0.62 $4,674.00 <br />133 Replace Topsoil from Stockpile to Gulch A Pond DOZER 1 14.13 $3,797.00 <br />134 Replace Topsoil from Stockpile to Prospect Pond DOZER 1 9.19 $2,469.00 <br />135 Replace Topsoil from Stockpile to Streeter Pond DOZER 1 14.84 $3,987.00 <br />136 Replace Topsoil from Stockpile to Gossard Loop <br />Pond <br />DOZER 1 1.77 $475.00 <br />137 Replace Topsoil from Stockpile to Gossard Pond DOZER 1 5.30 $1,424.00 <br />138 Replace Topsoil from Stockpile to Sewage and <br />Aeration Pond <br />DOZER 1 10.25 $2,753.00 <br />139 Replace Topsoil from Stockpile to Stoker Siding <br />Pond <br />DOZER 1 2.12 $570.00 <br />140 Replace Topsoil from Stockpile to Wash Bay Pond DOZER 1 12.72 $3,418.00 <br />141 Replace Topsoil from Stockpile to Wash Bay <br />Sediment Sump <br />DOZER 1 2.47 $664.00 <br />142 Replace Topsoil from Stockpile to Work Area <br />Pond <br />DOZER 1 13.43 $3,608.00 <br />143 Replace Topsoil from Stockpile to Section 16 Pond DOZER 1 16.25 $4,367.00 <br />144 Replace Topsoil from Stockpile to East Taylor <br />Pond <br />DOZER 1 6.01 $1,614.00 <br />145 Replace Topsoil from Stockpile to Taylor Pond DOZER 1 1.77 $475.00 <br />146 Replace Topsoil from Stockpile to West Pit Pond DOZER 1 10.95 $2,943.00 <br />147 Replace Topsoil from Stockpile to Section 28 Pond DOZER 1 8.83 $2,373.00 <br />148 Replace Topsoil from Stockpile to Section 21 Pond DOZER 1 8.83 $2,373.00 <br />149 Replace Topsoil from Stockpile to West Taylor <br />Pond <br />DOZER 1 8.83 $2,373.00 <br />150 Replace Topsoil from Stockpile to Collection <br />Ditches <br />EXCAVATE 1 679.71 $104,371.00 <br />160 Plug and Seal All Wells and Boreholes BOREHOLE 1 534.00 $205,119.28 <br />161 Seal South Taylor In-Pit Exploration Holes BOREHOLE 1 116.00 $26,097.87 <br />162 Plug and Seal Three South Taylor Pit Exploration <br />Holes <br />BOREHOLE 1 12.00 $4,085.89 <br />163 Plug and Seal 15 Geotechnical Holes BOREHOLE 1 30.00 $3,515.45 <br />165 Reseed East Pit with Grazing Land Seed Mix - <br />Active Pit Area <br />REVEGE 1 545.00 $150,249.00 <br />166 Reseed East Pit P with Sagebrush Steppe Seed Mix REVEGE 1 90.40 $36,474.00 <br />167 Reseed East Pit with Grazing Land Seed Mix - <br />Phase II Areas <br />REVEGE 1 420.90 $200,942.00 <br />168 Reseed West Pit with Grazing Land Seed Mix REVEGE 1 2,257.60 $622,391.00 <br />169 Reseed West Pit with Sagebrush Steppe Seed Mix REVEGE 1 400.00 $161,388.00 <br />170 Reseed Section 16 Pit with Grazing Land Seed <br />Mix - Phase II <br />REVEGE 1 394.60 $94,193.00 <br />171 Reseed South Taylor Pit with Grazing Land Seed <br />Mix <br />REVEGE 1 1,736.40 $478,703.00 <br />172 Reseed South Taylor Pit with Sagebrush Steppe <br />Seed Mix <br />REVEGE 1 400.00 $161,388.00 <br />173 Reseed Facilities Area with Grazing Land Seed <br />Mix <br />REVEGE 1 849.00 $234,058.00