Laserfiche WebLink
Loader Worksheet Cont'd Task#005 Page 2 of 2 <br /> Haul Route: 1 300 f 5.00 5.00 10.00 0.3763 {Cat HB) <br /> Return Route: 300 -5.00 5.00 0.00 0.1960 (Cat HB) <br /> Total Travel Time: 0.5723 minutes <br /> Total Cycle Time: 1.0923 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 7.50 LCY(heaped) <br /> Bucket Fill Factor: 0.875 Loose material- I"and over (85 -90%)0.875 <br /> Adjusted Capacity: 6.56 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 7560 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 360.47 LCY'Hour <br /> Adjusted Hourly Unit Production: 299.19 LCY/Hour <br /> Adjusted Hourly Fleet Production: 299.19 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: I Loader(s) Total job time: 0.75 Hours <br /> Unit cost: $0.537 /LCY Total job cost: $120 <br /> CIRCES Cost Estimating Software <br />