Laserfiche WebLink
Page 1 of 2 <br /> WHEEL LOADER—LOAD AND CARRY WORK <br /> Task description: Install rip ram drainage ditches <br /> Site: Weber Pit No 2 Permit Action: 2016 Update Permit/Job#: M1995056 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 5/19/2016i County: Archuleta _ Filename: M056-005 <br /> User: LJW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 980H high lift Horsepower: 315 <br /> Attachment 1: ROPS Cab Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization°o <br /> Ownership Cost/Hour: $51.27 NA <br /> Operating Cost/Hour: $70.82 100 <br /> Operator Cost/Hour: $38.60 NA <br /> Total Unit Cost/Hour: $160.68 <br /> Total Fleet Cost/Hour: $160.68 <br /> MATERIAL QUANTITIES <br /> Initial volume: 224 CCY Swell factor: 1.000 <br /> Loose volume: 224 LCY <br /> Source of estimated volume: Division of Reclamation,M_ining&Safety <br /> of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Loader Cycle Time: Unadjusted Basic Cycle Time(load,dump, 0.550 minutes <br /> maneuver): <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Material 6"and over diameter 0.03 0.030 (Cat HB <br /> Stockpile: Dumped by truck 0.02 0.020 Cat HB <br /> Truck Ownership: Common ownership of trucks and loaders- -0.040 (Cat HB) <br /> 0.04 <br /> Operation: Constant operation-0.04 -0.040 Cat HB) <br /> Dump Target: Nominal tar et 0.00 0.000 Cat HB <br /> Net Cycle Time Adjustment: -0.030 _ minutes <br /> Adjusted Basic Cycle Time: 0.520 minutes <br /> Rolling Resistance—Road Conditions <br /> Haul: Rutted dirt,little maintenance,no water,2"tire penetration 5.0 <br /> Return: Rutted dirt,Iittle maintenance,no water,2"tire penetration 5.0 <br /> Haul and Return Time <br /> Length Grade Res. Rolling Total Res. Travel Time <br /> feet) (%) Res. (%) 0 o) j (minutes) Source <br /> CIRCES Cost Estimating Software <br />