My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-23_REVISION - M1995056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995056
>
2016-05-23_REVISION - M1995056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2020 11:10:03 PM
Creation date
5/24/2016 9:21:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995056
IBM Index Class Name
Revision
Doc Date
5/23/2016
Doc Name
SI-02 Notice and Calculations
From
DRMS
To
Andy Weber
Inspection Date
5/4/2016
Email Name
LJW
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDRAULIC EXCAVATOR WORK <br /> Task description: Place rip rap in ditches <br /> Site: Weber Pit No 2 Permit Action: 2016 Update Permit/Job#: M1995056 <br /> PROJECT IDENTIFICATION <br /> Task#: 006 State: Colorado Abbreviation: None <br /> Date: 5/19/2016 County: Archuleta Filename: M056-006 <br /> User: LJW <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat 315D L 8'-6"Stick Horsepower: 115 <br /> Attachment 1: ROPS Cab Weight(MT): 17.32 <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization°'o <br /> Ownership Cost/Hour: $24.65 NA <br /> Operating Cost/Hour: $34.46 100 <br /> Operator Cost/Hour: $35.36 NA <br /> Total Unit Cost/Hour: $94.47 <br /> Total Fleet Cost/Hour: $94.47 <br /> MATERIAL QUANTITIES <br /> Initial volume: 224 CCY Swell factor: 1.000 <br /> Loose volume: 224 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Excavator Cycle Time(load bucket swing loaded dump bucket swing empty): <br /> Basic Job Condition Description: AVERAGE <br /> Secondary Job Condition within Basic Description: AVERAGE <br /> Cycle Time Value: 0.256 minutes <br /> Load Bucket Capacity <br /> Bucket Size Class: Lane <br /> Rated Capacity: 1.15 LCY(heaped) <br /> Bucket Fill Factor: 0.875 Loose material- 1"and over 85-900 u`,0.875 <br /> Adjusted Capacity: 1.01 LCY <br /> Job Condition Correction Factors Site Altitude: 7560 feet <br /> Source <br /> Altitude Adj: 0.90 _� (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.75 multiplier <br /> Unadjusted Hourly Unit Production: 235.84 LCY Hour <br /> Adjusted Hourly Unit Production: 176.17 LCY/Hour <br /> Adjusted Hourly Fleet Production: 176.17 LCY/Hour <br /> JOB TUAE AND COST <br /> Fleet size: 1 Excavator Total job time: 1.27 Hours <br /> Unit cost: $0.536 /LCY Total job cost: $120 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.