Laserfiche WebLink
Abandonment <br />DRMS Bond <br />DMRS <br />Diameter/ <br />Depth <br />Report <br />Hole ID <br />AKA <br />Release Status <br />Insp Date <br />Surface <br />Depth <br />Sealed <br />Pad Area <br />Road Area <br />Map 09 Identifier Permitting Action <br />For Drill Pad <br />Casing <br />Acres <br />Acres <br />0.5 <br />Yes <br />DH -2010-2 <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.675 <br />2270 <br />0.5 <br />0 <br />204 Bowie #1 Mine MR -12, <br />1362 <br />2.00 <br />1.10 <br />MR125 <br />Yes <br />GVB-10A <br />GVB-B10A <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/7/14 <br />757 <br />500 <br />1 <br />0.4 <br />205,207 Bowie #1 Mine MR -12! <br />Yes <br />GVB-10B <br />GVB-B10B <br />Phase I <br />Aug. 4-6, 2015 <br />9.625/7/14 <br />605 <br />386 <br />1 <br />0.7 <br />206,208 <br />1787 <br />1.00 <br />0.23 <br />MR -127 -Bowie No. 1 D <br />Yes <br />2011-2 <br />Phase I, II <br />Aug. 4-6, 2015 <br />6/9.75 <br />1787 <br />1787 <br />1.0 <br />0.23 <br />012,015 <br />4 utility holes, one GVB <br />1.00 <br />0.30 <br />MR133 <br />Utility holes <br />N/A <br />10 <br />520 <br />0 <br />0 <br />242 <br />Utility holes <br />N/A <br />10 <br />520 <br />0 <br />0 <br />242 <br />Utility holes <br />N/A <br />10 <br />520 <br />0 <br />0 <br />242 <br />Utility holes <br />N/A <br />10 <br />520 <br />0 <br />0 <br />242 <br />Yes <br />GVB-13F <br />GVB-B13F <br />Phase I <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1635 <br />925 <br />1 <br />0.3 <br />243 <br />emergency GVB <br />0 <br />MR134 <br />N/A <br />B13 Vent <br />Phase I <br />Aug. 4-6, 2015 <br />24 <br />1085 <br />245 Not Drilled, Not Permit <br />emergency GVB <br />1 <br />0.4 <br />MR135 <br />Yes <br />GVB-B13C-1 <br />Phase I <br />Aug. 4-6, 2015 <br />7/9.625/14 <br />1100 <br />206 <br />1 <br />0.4 <br />246,247 <br />3 GVBs <br />3240 <br />0.6 <br />0.0 <br />TR31 <br />Yes <br />GOB -1 <br />GVB-Dl-A <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/10 <br />1130 <br />575 <br />0.03 <br />0 <br />48 <br />Yes <br />GOB -2 <br />GVB-Dl-B <br />Phase I <br />Aug. 4-6, 2015 <br />6/10 <br />960 <br />453 <br />0.03 <br />0 <br />47 <br />Yes <br />GOB -3 <br />GVB-D2-A <br />Reclaimed <br />5.5/10 <br />1150 <br />397 <br />0.03 <br />0 <br />49 <br />5 GVBs <br />3800 <br />1.2 <br />3.4 <br />TR17 <br />Yes <br />GVB-D-4A <br />N/A <br />Aug. 4-6, 2015 <br />5.5/10 <br />780 <br />230 <br />0.4 <br />0.3 <br />043,073 <br />Yes <br />GVB-D-2C <br />GVB-D2-C <br />N/A <br />Aug. 4-6, 2015 <br />5.5/10 <br />760 <br />71 <br />0.2 <br />0.4 <br />046,025 <br />Yes <br />GVB-D-3A <br />GVB-D3-A <br />Inaccessible <br />7.63/10 <br />870 <br />497 <br />0.2 <br />0.1 <br />058,015 <br />Yes <br />GVB-D-3B <br />GVB-D3-B <br />N/A <br />Aug. 4-6, 2015 <br />5.5/10 <br />560 <br />141 <br />0.2 <br />0.5 <br />045,026 <br />Yes <br />GVB-D-3C <br />GVB-WD3-C <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/10 <br />830 <br />351 <br />0.2 <br />0.3 <br />057,020 <br />0.1 <br />019 Road Only <br />0.6 <br />027 Road Only <br />0.7 <br />029 Road Only <br />0.1 <br />030 Road Only <br />0.3 <br />056 Road Only <br />16 GVBs <br />21810 <br />9.5 <br />12.3 <br />TR20 <br />Yes <br />GVB-D-7A <br />GVB-D7-A <br />Open <br />5.5/10 <br />465 <br />15 <br />0.5 <br />0.6 <br />041, 036, 037 <br />Yes <br />GVB-D2-B <br />Phase I <br />Aug. 4-6, 2015 <br />6 <br />860 <br />115.5 <br />0.5 <br />063 Road in TR -17 (27) <br />Yes <br />GVB-D-5A <br />Open <br />5.5/10 <br />332 <br />150 <br />0.5 <br />0.2 <br />042,033 <br />Yes <br />GVB-D-4B <br />Phase I <br />Aug. 4-6, 2015 <br />5.5/12 <br />610 <br />26 <br />0.5 <br />0.4 <br />044,028 <br />Yes <br />GVB-WD-3C <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/10 <br />818 <br />96 <br />0.5 <br />0.8 <br />051, 005, 008 <br />Yes <br />GVB-WD-2B <br />GVB-WD2-B <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/10 <br />258 <br />54 <br />0.5 <br />1.4 <br />053, 001, 002, 003 <br />Yes <br />GVB-WD-3B <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/10 <br />996 <br />60 <br />0.5 <br />0.6 <br />052, 007, 009 <br />Yes <br />GVB-WD-2A <br />GVB-WD-3A <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/10 <br />990 <br />420 <br />0.5 <br />0.1 <br />055,004 <br />Yes <br />GVB-WD-3A <br />Phase I, II <br />Aug. 4-6,201S <br />5.5/10 <br />960 <br />335 <br />0.5 <br />0.2 <br />054,006 <br />Yes <br />GVB-D-4C <br />GVB-D4-C <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/12 <br />1330 <br />391 <br />0.5 <br />0.1 <br />059,021 <br />Yes <br />GVB-D-56 <br />GVB-D5-B <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/12 <br />1275 <br />639 <br />0.5 <br />0.4 <br />060,022 <br />Yes <br />GVB-D-5C <br />GVB-D5-C <br />I Phase I, II <br />Aug. 4-6, 2015 <br />5.5/121 <br />1310 <br />275 <br />0.5 <br />0.2 <br />061,023 <br />line <br />ted <br />TR -104 2.05-45v 09/15 <br />