My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-06_PERMIT FILE - C1996083A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2016-05-06_PERMIT FILE - C1996083A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 9:40:00 AM
Creation date
5/9/2016 7:45:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/6/2016
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Abandonment <br />DRMS Bond <br />DMRS <br />Diameter/ <br />Depth <br />Phase I, II Aug. 4-6, 2015 <br />9.625 732 730 1 0 194 <br />Report <br />Hole ID <br />AKA <br />Release Status <br />Insp Date <br />Surface <br />Depth Sealed <br />Pad Area <br />Road Area <br />Map 09 Identifier Permitting Action <br />9.375 1570 Hole not drilled and not permitted 193 <br />N/A <br />GVB-10D-2 GVB-10C <br />For Drill Pad <br />9.625/14 1760 177 <br />Casing <br />Acres <br />Acres <br />1 <br />N/A <br />6 <br />50 <br />0 <br />2.7 <br />188189 DELETED TR -96 <br />2 <br />N/A <br />Hole <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />3 geotechnical holes <br />3 <br />N/A <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />MR115 <br />Yes <br />4 <br />N/A <br />Aug. <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />0 <br />196 <br />5 <br />N/A <br />TC-GEO 2 <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />60 <br />0 <br />6 <br />N/A <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />2 <br />60 <br />7 <br />N/A <br />0 <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />8 <br />N/A <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />9 <br />N/A <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />Access road no drilling <br />10 <br />N/A <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />11 <br />N/A <br />6 <br />50 <br />0 <br />0 <br />DELETED TR -96 <br />Move geotech holes <br />6 GVBs <br />0 <br />0 <br />MR92 <br />Yes <br />GVB-8A-A <br />Phase I, II <br />Aug. 4-6, 2015 <br />7/9.625 <br />560 194 <br />0 <br />0 <br />190 <br />Aug. <br />GVB <br />7/9.625/14 <br />768 <br />1721 <br />1 <br />0 <br />0 <br />0 <br />MRS00 <br />Yes <br />GVB-8A-B <br />Aug. <br />Phase I, II <br />Aug. 4-6, 2015 <br />1 7/9.6251 <br />960 825 <br />0 <br />01 <br />191 <br />Yes <br />GVB-812A <br />Phase I <br />Aug. <br />4-6, 2015 <br />7/9.625/14 <br />1056 <br />O.S1 <br />IMR104 <br />N/A <br />I GVB 913 <br />N/A <br />GVB-6126 & Road <br />Phase I <br />Aug. <br />Hole not drilled and not permitted lRelocation only, no sea <br />ling task <br />n MR <br />epths <br />TR -104 2.05-451v 09/15 <br />1 0 IMR105 <br />Yes <br />GVB-8-TG <br />Phase I, II Aug. 4-6, 2015 <br />9.625 732 730 1 0 194 <br />Changes/additions to GVB <br />0 IMR106 <br />N/A <br />GVB-10U-1 <br />Phase I, II <br />Added holes under TR -52 and MR -104 <br />N/A <br />GVB-10B <br />N/A <br />9.375 1570 Hole not drilled and not permitted 193 <br />N/A <br />GVB-10D-2 GVB-10C <br />Phase I, II Aug. 4-6, 2015 <br />9.625/14 1760 177 <br />ling task <br />n MR <br />epths <br />TR -104 2.05-451v 09/15 <br />Accounted for in TR -52 <br />N/A <br />GVB-10U-1 <br />Phase I, II <br />Aug. <br />4-6, 2015 <br />9.375 <br />1650 <br />180 <br />Accounted for in TR -52 <br />N/A <br />GVB-10U-2 <br />N/A <br />9.375 <br />1650 <br />Hole <br />not drilled and <br />not permitted <br />177 <br />3 geotechnical holes <br />180 <br />0 <br />0 <br />MR115 <br />Yes <br />TC-GEO 1 <br />N/A <br />Aug. <br />4-6, 2015 <br />2 <br />60 <br />60 <br />0 <br />0 <br />196 <br />Yes <br />TC-GEO 2 <br />N/A <br />Aug. <br />4-6, 2015 <br />2 <br />60 <br />60 <br />0 <br />0 <br />196 <br />Yes <br />TC-GEO 3 <br />N/A <br />Aug. <br />4-6, 2015 <br />2 <br />60 <br />60 <br />0 <br />0 <br />196 <br />Terror Creek Access <br />6 <br />MR116 <br />Access road no drilling <br />Terror Creek geotechnical <br />N/A <br />MR119 <br />Move geotech holes <br />6 GVBs <br />5315 <br />6.20 <br />1.60 <br />MR123 <br />Yes <br />GVB-B11A <br />Phase I <br />Aug. <br />4-6, 2015 <br />7/9.625/14 <br />768 <br />1721 <br />1 <br />0 <br />209 <br />Yes <br />GVB-811B & Road <br />Phase I <br />Aug. <br />4-6, 2015 <br />7/9.625/14 <br />740 <br />274 <br />1.1 <br />0 <br />210 <br />Yes <br />GVB-812A <br />Phase I <br />Aug. <br />4-6, 2015 <br />7/9.625/14 <br />1056 <br />600 <br />1 <br />1.3 <br />211 <br />Yes <br />GVB-6126 & Road <br />Phase I <br />Aug. <br />4-6, 2015 <br />7/9.625/14 <br />855 <br />126 <br />1.1 <br />0 <br />212 <br />Yes <br />GVB-812C <br />Phase I <br />Aug. <br />4-6, 2015 <br />7/9.625/14 <br />865 <br />422 <br />1 <br />0 <br />213 <br />Yes <br />GVB-613A <br />Phase I <br />Aug. <br />4-6, 2015 <br />7/9.625/14 <br />1031 <br />655 <br />1 <br />0.3 <br />214 <br />2 GVBs <br />2.00 <br />0.40 <br />MR124 <br />Yes <br />GVB-1311C <br />Phase I <br />I Aug. <br />4-6, 2015 <br />7/9.625/14 <br />7551 <br />1581 <br />1 <br />0 <br />218 <br />Revised MR -123 Hole C <br />Yes <br />GVB-812D <br />Phase 1 <br />I Aug. <br />4-6, 2015 <br />7/9.625/14 <br />10611 <br />351 <br />11 <br />0.4 <br />219 <br />ling task <br />n MR <br />epths <br />TR -104 2.05-451v 09/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.