Abandonment
<br />DRMS Bond
<br />DMRS
<br />Diameter/
<br />Depth
<br />Report
<br />Hole ID
<br />AKA
<br />Release Status
<br />Insp Date
<br />Surface
<br />Depth
<br />Sealed
<br />Pad Area
<br />Road Area
<br />Map 09 Identifier Permitting Action
<br />For Drill Pad
<br />Casing
<br />Acres
<br />Acres
<br />Yes
<br />TC -05-04
<br />TR-CRK-78
<br />N/A
<br />Aug. 4-6,2015
<br />2
<br />1010
<br />1010
<br />143
<br />5 GVBs
<br />4249
<br />0
<br />0
<br />MRSS
<br />Yes
<br />GVB-B2-A
<br />GVB-B2-B
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/6.6/16
<br />1197
<br />790
<br />0
<br />0
<br />144 Drilled from Existing di
<br />N/A
<br />GVB-B2-B
<br />N/A
<br />0
<br />0
<br />144 Hole Relocated
<br />Yes
<br />GVB-B2-C
<br />GVB-B2-E
<br />Phase 1, II
<br />Aug. 4-6, 2015
<br />9.625/6.6/16
<br />762
<br />151
<br />0
<br />0
<br />144 Drilled from Existing di
<br />Yes
<br />GVB-133-A
<br />GV13-B3-C
<br />Phase 1, II
<br />Aug. 4-6, 2015
<br />10.75/16
<br />1220
<br />739
<br />0
<br />0
<br />144 Drilled from Existing di
<br />Yes
<br />GVB-B3-B
<br />GVB-B3-D
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/16
<br />1070
<br />797
<br />0
<br />0
<br />144 Drilled from Existing di
<br />Emergency GVB
<br />0.5
<br />1.4
<br />MR58
<br />Yes
<br />GVB-BS-Al
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625
<br />1540
<br />860
<br />0.51
<br />1.4
<br />145,146
<br />0.5
<br />0
<br />MR61
<br />Yes
<br />GVB-B2-B
<br />GVB-B2-D
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/6.6/16
<br />1441
<br />695
<br />0.5
<br />0
<br />151 Drill Hole Relocation
<br />One GVB, transfer one from NOI
<br />0.5
<br />0
<br />MR62
<br />Yes
<br />GVB-B2-A2
<br />GVB-B2-C
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/6.6/16
<br />762
<br />302
<br />0.5
<br />0
<br />152
<br />3 GVB freeman
<br />2371
<br />1.5
<br />0.1
<br />MR65
<br />Yes
<br />GVB-6A
<br />GVB-B6-A
<br />10.75/7.6/16
<br />700
<br />58
<br />0.5
<br />0.1
<br />153,154
<br />Yes
<br />GVB-613
<br />GVB-B6-B
<br />Phase I, II
<br />Aug. 4-6, 2015 7.63/10.75/16
<br />764
<br />764
<br />0.5
<br />153
<br />Yes
<br />GV13-6C
<br />GVB-B6-C
<br />N/A
<br />Aug. 4-6, 2015 7.63/10.75/16
<br />907
<br />717
<br />0.5
<br />153
<br />2 GVB
<br />2707
<br />1
<br />0.6
<br />MR67
<br />Yes
<br />GVB-4A
<br />GVB-B4-A
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />10.75/7/16
<br />1475
<br />430
<br />0.5
<br />0.5
<br />155,156
<br />Yes
<br />GVB-5A
<br />GVB-135-A
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/7.6/16
<br />1232
<br />150
<br />0.5
<br />0.1
<br />155,157
<br />11 geotechnical holes
<br />MR68
<br />Withdrawn
<br />6 geotechnical holes
<br />434
<br />0
<br />MR72
<br />Yes
<br />G3-1
<br />N/A
<br />Aug. 4-6, 2015
<br />4
<br />58
<br />58
<br />158 Gob Pile #3
<br />Yes
<br />G3-2
<br />N/A
<br />Aug. 4-6, 2015
<br />4
<br />90
<br />90
<br />158 Gob Pile #3
<br />Yes
<br />G3-3
<br />N/A
<br />Aug. 4-6, 2015
<br />4
<br />50
<br />50
<br />158 Gob Pile #3
<br />Yes
<br />G3-4
<br />N/A
<br />Aug. 4-6, 2015
<br />4
<br />55
<br />55
<br />158 Gob Pile #3
<br />Yes
<br />G3-5
<br />N/A
<br />Aug. 4-6, 2015
<br />4
<br />71
<br />71
<br />158 Gob Pile #3
<br />Yes
<br />G3-6
<br />N/A
<br />Aug. 4-6, 2015
<br />4
<br />40
<br />40
<br />158 Gob Pile #3
<br />Yes
<br />G3-7
<br />N/A
<br />Aug. 4-6, 2015
<br />4
<br />70
<br />70
<br />158 Gob Pile #3
<br />1 geotechnical hole
<br />0.5
<br />0.1
<br />MR75
<br />N/A
<br />GEO-TECH-04
<br />N/A
<br />Aug. 4-6, 2015
<br />8
<br />600
<br />0
<br />01
<br />159
<br />For Hubbard Creek Vent Shaft - Destroyed during shaft construction. Disturbance include with shaft constructio
<br />7 GVBs
<br />11720
<br />3.0
<br />0.9
<br />MR78
<br />Yes
<br />GVB-6D
<br />GVB-66-D
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />7/9.625/14
<br />1,624
<br />615
<br />0.5
<br />0
<br />161
<br />Yes
<br />GV13-6E
<br />GVB-B6-E
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />7/9.625/14
<br />1,677
<br />907
<br />0.5
<br />0.2
<br />162,168
<br />N/A
<br />GV13-6F
<br />N/A
<br />8
<br />1,712
<br />0
<br />0
<br />163,169 Deleted
<br />Yes
<br />GVB-7A
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/14
<br />1,648
<br />371
<br />0.5
<br />0.3
<br />164,170
<br />Yes
<br />GVB-7B
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/14
<br />1,659
<br />1,357
<br />0.5
<br />0.1
<br />165, 171
<br />Yes
<br />GVB-7C
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/14
<br />1,690
<br />1,418
<br />0.5
<br />0
<br />166
<br />Yes
<br />GVB-7D
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/14
<br />1,710
<br />486
<br />0.5
<br />0.3
<br />167, 172
<br />MR -79 Relocated GV13-6E relocated GV13-6E
<br />Borehole to D Seam
<br />0
<br />0
<br />JMR86
<br />Yes
<br />HC -08-02
<br />MW -82
<br />N/A
<br />Aug. 4-6, 2015
<br />7
<br />264
<br />264
<br />0
<br />0
<br />187
<br />11 geotechnical holes
<br />1 550.0
<br />01
<br />2.7
<br />189 MR88
<br />ill sites.
<br />ill sites.
<br />ill sites.
<br />ill sites.
<br />TR -104 2.05-45111 09/15
<br />
|