My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-06_PERMIT FILE - C1996083A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2016-05-06_PERMIT FILE - C1996083A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 9:40:00 AM
Creation date
5/9/2016 7:45:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/6/2016
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Abandonment <br />DRMS Bond <br />DMRS <br />Diameter/ Depth <br />4-6, 2015 <br />Report <br />Hole ID AKA <br />Release Status <br />Insp Date <br />Surface Depth Sealed Pad Area I Road Area <br />Map 09 Identifier Permitting Action <br />Yes <br />5 <br />For Drill Pad <br />Aug. <br />Casing Acres jAcres <br />4 <br />N/A <br />GVB-W2-C GVB-WD2-C <br />N/A <br />0 <br />Hole moved by this minor revision, hole permitted under PR -05 <br />Yes <br />6 <br />14 Gob Pile geotechnical holes <br />Aug. <br />4-6, 2015 <br />1 4211 0 1.3 <br />138 MR29 <br />Yes <br />1 <br />N/A <br />Aug. 4-6, 2015 <br />41 301 301 01 0 <br />See Lambert <br />Yes <br />2 <br />N/A <br />Aug. 4-6, 2015 <br />41 301 301 01 01 <br />IGeotechnical Report <br />Yes 1 3 1 1 N/A I Aug. 4-6, 2015 1 41 251 251 01 01 Idated November 10, 2003 <br />Yes <br />4 <br />N/A <br />Aug. <br />4-6, 2015 <br />4 <br />30 <br />30 <br />0 <br />0 <br />in Volume IX. <br />Yes <br />5 <br />N/A <br />Aug. <br />4-6, 2015 <br />4 <br />25 <br />25 <br />0 <br />0 <br />Disturbance covered <br />Yes <br />6 <br />N/A <br />Aug. <br />4-6, 2015 <br />4 <br />25 <br />25 <br />0 <br />0 <br />by Gob Pile #2 <br />Yes <br />7 <br />N/A <br />Aug. <br />4-6, 2015 <br />4 <br />31 <br />31 <br />0 <br />0 <br />Yes <br />8 <br />N/A <br />Aug. <br />4-6, 2015 <br />4 <br />25 <br />25 <br />0 <br />0 <br />Yes <br />9 <br />N/A <br />Aug. <br />4-6, 2015 <br />4 <br />25 <br />25 <br />0 <br />0 <br />Yes <br />10 <br />N/A <br />Aug. <br />4-6, 2015 <br />4 <br />25 <br />25 <br />0 <br />0 <br />Yes <br />11 <br />N/A <br />Aug. <br />4-6, 2015 <br />4 <br />30 <br />30 <br />0 <br />0 <br />Yes <br />12 <br />N/A <br />Aug. <br />4-6, 2015 <br />4 <br />30 <br />30 <br />0 <br />0 <br />Yes <br />13 <br />N/A <br />I <br />Aug. <br />4-6, 2015 <br />4 <br />30 <br />30 <br />0 <br />0 <br />Yes <br />14 <br />N/A <br />Aug. <br />4-6, 2015 <br />4 <br />60 <br />60 <br />0 <br />0 <br />5 piezometers from NOI <br />3 alluvial wells <br />I <br />i <br />0 <br />0 <br />0 <br />139 MR30 <br />n diagram <br />TR -104 2.05-45i i 09/15 <br />MR31 is well completic <br />AW -15 <br />N/A <br />3 <br />86 <br />0 <br />0 <br />139 Depths from AHR <br />AW -16 <br />N/A <br />3 <br />75 <br />0 <br />0 <br />139 <br />AW -17 <br />N/A <br />3 <br />62 <br />0 <br />0 <br />139 <br />4 geotechnical holes <br />MR 40 <br />No bond required <br />5 wells from NOI <br />0 <br />MR42 <br />N/A <br />DH -65 <br />IP -65 <br />N/A <br />Transfer N01 holes <br />N/A <br />DH -66 <br />IP -66 <br />N/A <br />into permit. <br />N/A <br />DH -66A <br />IP -66A <br />N/A <br />Duplicated Below <br />N/A <br />DR -67 <br />N/A <br />N/A <br />DH -67A <br />N/A <br />5 piezometers from NOI <br />245 <br />0 <br />0 <br />MR45 <br />BD -101 <br />N/A <br />2 <br />16.5 <br />0 <br />0 <br />Bruce Park Dam <br />BD -103 <br />N/A <br />2 <br />53 <br />0 <br />0 <br />Piezometers <br />BD -105 <br />N/A <br />2 <br />107 <br />0 <br />0 <br />Ref Volume X <br />BD -105A <br />N/A <br />2 <br />38.5 <br />0 <br />0 <br />BD -102 <br />N/A <br />2 <br />30 <br />0 <br />0 <br />3 piezometers from NOI <br />92 <br />MR46 <br />BL -101A <br />N/A <br />2 <br />29 <br />0 <br />0 <br />Bruce Park Dam <br />BL -102 <br />N/A <br />2 <br />34 <br />0 <br />0 <br />Piezometers <br />BL -102A <br />N/A <br />2 <br />29 <br />0 <br />0 <br />Ref Volume X <br />D -Seam to Surface Borehole <br />MR48 <br />pilot hole for vent shaft <br />N/A <br />Aug. 4-6, 2015 <br />15 <br />215 <br />0 <br />0 <br />2 geotechnical holes <br />0 <br />MR53 <br />Yes <br />B -BURN -24 <br />Phase I <br />Aug. 4-6, 2015 <br />6 <br />303 303 <br />0 <br />0 <br />142 Only approved one hol <br />N/A <br />TC -05-04 <br />TR-CRK-78 <br />N/A <br />Aug. 4-6,2015 <br />0 <br />0 <br />1 geotechnical hole <br />I 10 <br />0 <br />IMR54 <br />n diagram <br />TR -104 2.05-45i i 09/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.