Laserfiche WebLink
Abandonment <br />DRMS Bond <br />DMRS <br />Diameter/ <br />Depth <br />Report <br />Hole ID <br />AKA <br />Release Status <br />Insp Date <br />Surface <br />Depth <br />Sealed <br />Pad Area <br />Road Area <br />Map 09 Identifier Permitting Action <br />For Drill Pad <br />Casing <br />Acres <br />Acres <br />Yes <br />GVB-D-6C <br />GVB-D6-C <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/12 <br />1330 <br />149 <br />0.5 <br />0.2 <br />062,024 <br />Yes <br />GVB-D-6A <br />GVB-D-6A <br />Open <br />5.5/12 <br />461 <br />Unknown <br />0.5 <br />0.7 <br />064, 034, 035 <br />Yes <br />GVB-D-6B <br />GVB-D6-B <br />Reclaimed <br />5.5/12 <br />900 <br />57 <br />0.5 <br />1.0 <br />065, 039, 040 <br />Yes <br />GVB-D-7B <br />GVB-D7-B <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/12 <br />720 <br />69 <br />0.5 <br />0.9 <br />066,038 <br />Yes <br />GVB-D-7C <br />GVB-D7-C <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/12 <br />1340 <br />91 <br />0.5 <br />0.3 <br />075,074 <br />0.7 <br />010 Road Only <br />1.1 <br />011 Road Only <br />0.1 <br />012 Road Only <br />0.1 <br />013 Road Only <br />0.3 <br />014 Road Only <br />0.1 <br />018 Road Only <br />0.5 <br />031 Road Only <br />0.1 <br />069 Road Only <br />N/A <br />DH -57A <br />98-57A <br />N/A <br />0.5 <br />0.1 <br />070,017 Duplicated Below <br />N/A <br />DH -57B <br />98-57B <br />N/A <br />070 Duplicated Below <br />N/A <br />DH -58 <br />N/A <br />0.5 <br />0.7 <br />068, 016, 067 Duplicated Below <br />N/A <br />DH -58A <br />N/A <br />068 Duplicated Below <br />2 GVBs <br />1910 <br />1 <br />2.3 <br />TR21 <br />GVB-D-5D <br />GVB-D5-D <br />Phase I <br />Aug. 4-6, 2015 <br />6 <br />1140 <br />0.5 <br />0.7 <br />076-077 <br />Yes <br />GVB-WD-SA <br />GVB-WDS-A <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/13 <br />770 <br />150 <br />0.5 <br />1.6 <br />078-079 <br />5 GVBs, 2 exploration <br />10020 <br />3 <br />3.1 <br />TR23 <br />Yes <br />GVB-D-8C <br />GV8-D8-C <br />Reclaimed <br />5.5/10 <br />1000 <br />77 <br />0.5 <br />1.0 <br />087, 086, 088 <br />Yes <br />GVB-D-8B <br />GVB-D8-B <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/10 <br />1270 <br />487 <br />0.5 <br />0.6 <br />090, 089 <br />Yes <br />GVB-D-9B <br />GVB-D-9A <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/12 <br />1090 <br />504 <br />0.5 <br />0.8 <br />092,091, 093 <br />Yes <br />GVB-D-8A <br />Phase I, II <br />Aug. 4-6, 2015 <br />7.625/10 <br />1222 <br />274 <br />0.5 <br />0.5 <br />094,100 <br />GVB-D-9A <br />Phase I, II <br />Aug. 4-6, 2015 <br />6 <br />1290 <br />094 <br />IP99-16 <br />Phase I, II <br />Aug. 4-6, 2015 <br />6 <br />1960 <br />0.5 <br />096 <br />N/A <br />IP99-14 <br />N/A <br />0.5 <br />97 Deleted <br />N/A <br />IP99-17 <br />N/A <br />97 Deleted <br />N/A <br />IP99-11 <br />N/A <br />6 <br />1810 <br />0.2 <br />102,101 Not drilled will be dele <br />5 exploration <br />2627 <br />2.5 <br />TR25 <br />Yes <br />P -B -BURN -22 <br />N/A <br />Aug. 4-6, 2015 <br />6 <br />417 <br />417 <br />0.5 <br />129 <br />Yes <br />P -B -BURN -23 <br />Phase I, It <br />Aug. 4-6, 2015 <br />6 <br />490 <br />490 <br />0.5 <br />130 <br />N/A <br />P -TC -03-01 <br />TC -03-01 <br />6 <br />580 <br />0.5 <br />131 Mon Well <br />N/A <br />P -TC -03-02 <br />TC -03-02 <br />6 <br />580 <br />0.5 <br />133 Mon Well <br />Yes <br />P -TC -03-03 <br />TC -03-03 <br />N/A <br />Aug. 4-6,2015 <br />3 <br />560 <br />512 <br />0.5 <br />133 <br />4 exploration <br />3135 <br />0.5 <br />0 <br />TR28 <br />N/A <br />P -TC -03-04 <br />TC -03-04 <br />N/A <br />6 <br />760 <br />134 DELETED TR -32 <br />N/A <br />P -TC -03-05 <br />TC -03-05 <br />N/A <br />6 <br />795 <br />135 DELETED TR -32 <br />N/A <br />P -TC -03-06 <br />TC -03-06 <br />N/A <br />6 <br />840 <br />0.5 <br />136 DELETED TR -96 <br />N/A <br />P -TC -03-07 <br />TC -03-07 <br />N/A <br />6 <br />740 <br />137 DELETED TR -32 <br />3 GVBs adjust 3 exploration <br />3680 <br />21 <br />TR32 <br />Deleted P -TC -03-04, 5-1 <br />Yes <br />GVB-Bl-A <br />GVB-Bl-B <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.875 <br />880 <br />170 Drilled from existing drill sit <br />141 <br />Yes <br />GVB-Bl-B <br />GVB-Bl-C <br />Phase I, ll <br />Aug. 4-6, 2015 <br />6.625 <br />1160 <br />575 Drilled from existing drill sit <br />141 <br />)5 & 07 <br />TR -104 2.05-45v1 09/15 <br />