My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-26_REVISION - C1981035 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2016-04-26_REVISION - C1981035 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:21:13 PM
Creation date
4/27/2016 6:35:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
4/26/2016
Doc Name
Adequacy Review #4
From
DRMS
To
GCC Energy, LLC
Type & Sequence
TR20
Email Name
RAR
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GCCE Dec. 2015: King I 2.05.4 Pages 4, 5 and 5a have been revised to ensure that page breaks and <br />text are correct. <br />Resolved: Page break issue <br />Please leave a line space between the headings: <br />i. Grading and Backfilling and <br />ii. Mine Waste Rock Pile Reclamation <br />GCCE Dec. 2015: A line space has been placed between the above headings as requested. <br />Resolved <br />Please clarify: Does revised page SA replace page 5 of the permit? If so, please check page 5A text and <br />page breaks and assure text flows correctly and includes all necessary information currently in the <br />permit. <br />Also, for submitted revised page 5A Bold the headings: <br />i. Topsoil, Cover Material, Plant Growth Medium Stockpiles <br />ii. Topsoil, Cover Material, Plant Growth Medium Stockpile Seed Mix. <br />GCCE Dec. 2015: Revised King I 2.05.4 page 5 replaces page 5 of the permit. Page 5a is new. <br />Pages 4, 5 and 5a have been revised to ensure that page breaks and text are correct. The two <br />headings mentioned above have been formatted with bold text. <br />Resolved <br />DRMS Oct 2015: Please check text transition between Section 2.05.3 page 2 of the permit and page 3 <br />of revised page submitted and assure page breaks and text flow correctly and all necessary information <br />currently in the permit is included. <br />GCCE Dec. 2015: King I 2.05.3 pages 2 thru 5 have been revised to correct formatting and page <br />break issues. Attached pages replace current pages 2 thru 4. <br />Resolved pagination <br />Also, please break up the long first paragraph of submitted revised page 3 into two or three <br />paragraphs and resubmit revised pages. <br />GCCE Dec. 2015: The long paragraph mentioned is now several shorter paragraphs. <br />Resolved <br />As per a) above please provide dates when a representative of Trautner was present during the <br />earthmoving phase of the West Waste bank. <br />GCCE Dec. 2015: The "earthmoving phase" of the Trautner report referred to one scenario which <br />called for temporarily moving the coal mine waste from the West Waste Bank, installing an <br />underdrain system, and replacing the material in 12" — 24" lifts. Instead, the material was simply <br />moved to the permitted refuse pile and places as per approved designs. Trautner representatives <br />were not on hand to witness the process. <br />Resolved <br />Also please provide their evaluation documentation of the uniformity and general consistency of the <br />material moved. <br />GCCE Dec. 2015: See previous paragraph. Trautner representatives were not on hand to witness <br />Prepared by: R. Reilley April 2016 <br />File location: M:\ Coal\ rar\ 1MKingCoal\ TR20 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.