My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-07_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-04-07_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:37 PM
Creation date
4/7/2016 1:05:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/7/2016
Doc Name
CQA week ending 3/19/2016
From
Newmont Mining Corporation
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation ■ <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,March 19,2016 <br /> o K10+00 to K14+00 and 116+00 to 120+00 <br /> o 112+00 to 118+00 and ADR Haul Road <br /> o M26+00 to M30+00 and N4+00 to N8+00 <br /> o M18+00 to M22+00 and N2+00 to N4+00 <br /> o M12+00 to M14+00 and S22+00 to S24+00 <br /> Fill placement (hauled from stockpile) in areas bounded by bench stations: <br /> o N20+00 to N22+00 and S46+00 to S50+00 <br /> o J4+00 to J8+00 and ADR Haul Road 76+00 to 78+00 <br /> o West Perimeter Road and R4+00 to R6+00 <br /> An excavator equipped with a hammer attachment broke up oversized material so that it <br /> could be placed as structural fill. <br /> Compaction was achieved using a smooth drum roller. <br /> 1.3 Subgrade <br /> A NewFields representative inspected and approved subgrade for geogrid placement at <br /> UG#6520 on Tuesday, March 15. <br /> 1.4 Leak Detection Trench <br /> No Leak Detection activities performed during this reporting period. <br /> 1.5 Soil Liner Fill (SLF) <br /> SLF processing continued throughout the week at Dump 1. Approximately 73,057 dry tons of <br /> material has been processed as of Thursday, March 17, 2016. <br /> 2.0 GEOSYNTHETICS <br /> 2.1 Geogrid <br /> Approximately 5400 square feet (two layers) of geogrid was placed at UG#6520. <br /> Two samples of geogrid were taken by a NewFields representative and shipped to TRI for <br /> conformance testing. The samples were cut from Lot#314742 (Roll #5) and Lot#314744 (Roll <br /> #19). <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.