My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-07_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-04-07_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:37 PM
Creation date
4/7/2016 1:05:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/7/2016
Doc Name
CQA week ending 3/19/2016
From
Newmont Mining Corporation
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation M■ <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CCW <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,March 19,2016 <br /> 3.0 STORM WATER MANAGEMENT <br /> Best Management Practices continued to be performed. <br /> 4.0 NEWFIELDS LABORATORY ACTIVITIES <br /> Two samples of Soil Liner Fill (NF-SLF-5-C and NF-SLF-6-C) were collected from the processing <br /> plant. Sieve analysis, atterberg limits and compaction testing will be performed at the on-site <br /> laboratory. Permeability testing will be performed at the NewFields soils laboratory in Elko, <br /> Nevada. <br /> NewFields personnel worked to set up the on-site laboratory so that all sieve analysis, atterberg <br /> limits, compaction and permeability testing may be performed on-site. <br /> 5.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the weekly Contractor Planning Meeting (March 15, 2016), <br /> Ames daily safety meetings, NewFields daily safety meetings and the Mine Contractor Safety <br /> Meeting (March 17, 2016). <br /> Jay Moore and Mike Smith were also on site to meet with Tim Cazier with the State of <br /> Colorado. The meeting was held to discuss the expectations for the Record of Construction <br /> Report and drawings. <br /> 6.0 ISSUES AND CONCERNS <br /> On March 14, NewFields personnel inspected an area of the exposed geomembrane in Phase I. <br /> The geomembrane was inspected for damage and fill temperatures were taken to determine if <br /> the material was still frozen. Ames was informed of areas approved for DCF placement. <br /> NewFields will continue to monitor drain cover fill temperatures in the area. <br /> An area of finished grade drain cover to the east of the ADR 2, between the 9450-foot and <br /> 9550-foot elevation, had eroded slightly. NewFields personnel provided CC&V projects a <br /> remediation plan for the area. A NewFields representative will be present when Ames <br /> remediates the area. <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.