Laserfiche WebLink
Newmont Mining Corporation ■ <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> Newfields Job No.475.0106.006 <br /> Week Ending Saturday,March 12,2016 <br /> 0 134+00 to 138+00 and K28+00 to K32+00 <br /> o K26+00 to K30+00 and M20+00 to M24+00 <br /> o Below 132+00 to 136+00 <br /> Compaction with smooth drum rollers in areas bounded by bench stations: <br /> o Below the surge area <br /> o N18+00 to N22+00 and S44+00 to S48+00 <br /> 0 112+00 to 114+00 and K8+00 to K10+00 <br /> o F10+00 to F16+00 and H8+00 to H14+00 <br /> Material was cut from the hillside using a D6 dozer. An excavator loaded the material <br /> into 740 articulating haul trucks, who hauled the material to a local stockpile. Cut to <br /> stockpile took place in areas bounded by the following bench stations: <br /> o Above K8+00 to K10+00 <br /> o Below 14+00 to 112+00 <br /> o K12+00 to K14+00 and M4+00 to M6+00 <br /> o M36+00 to M40+00 and N14+00 to N18+00 <br /> o K26+00 to K30+00 and M20+00 to M22+00 <br /> 0 120+00 to 122+00 and K18+00 to K20+00 <br /> Stockpiled structural fill was spread along the wester perimeter road between stations <br /> R4+00 and R8+00. <br /> 1.3 Subgrade <br /> Subgrade was accepted on Tuesday, March 8 in the area of the Phase I Leak detection trench <br /> prior to the installation of the trench. The attached Figure 1 presents the area that was <br /> accepted. <br /> 1.4 Leak Detection Trench <br /> Approximately 200 LF of leak detection trench was installed below stations 54+00 to 56+00 of <br /> the ADR Haul Road in Phase I. <br /> Page 3 <br />