Laserfiche WebLink
March 22, 2016 C-1996-083/Bowie No. 2 Mine JDM <br /> Gob Pile#1 <br /> Gob Pile#1 has been inactive. Technical Revision No. 97 was approved and provides a variance from the <br /> requirement of Rule 4.10.4(4)for 0.2 acres of Gob Pile#1 where the slope was identified as being greater than 2:1 <br /> Gob Pile#2 <br /> Gob Pile#2 was dry and compacted near the northwest corner. No activities were on-going during the inspection <br /> with the majority of the gob being transported to Gob#3. The area on the east side of the pile was very stable with <br /> no issues. The west side of the pile in the area of bench#5 was graded and stable with gob material stockpiled. <br /> '`: . _:- �-y�....- �• '1�-`a _- may.. <br /> E--- o <br /> - Jf <br /> Gob#2 <br /> Gob Pile#3 <br /> Material was in the process of being rotated and worked at the time of the inspection. The pile was dry with no <br /> new material being placed on the pile at the time of the inspection. <br /> The under drain was discharging at the time of the ins ection with a trickle discharge. No problems were noted. <br /> a+x f ! ^ a V y t 1a a <br /> t <br /> Gob#3 Underdrain Gob#3 <br /> Gob Pile#4 <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 5 of 9 <br />