Laserfiche WebLink
March 22, 2016 C-1996-083/Bowie No. 2 Mine JDM <br /> Wpm - <br /> Pond J <br /> Ditches and culverts were in stable condition throughout the mine site. Numerous ditches and culverts throughout <br /> the facilities area displayed evidence of recent clean-out and clean-out of D-1 was on-going at the time of the <br /> inspection. Ditches and culverts were flowing at the time of the inspection,with no issues noted,with the <br /> exception of the following: <br /> -Ditch K-1 cleaned out material will need to be removed from the area of pond K. <br /> The pump house SAE was stable at the time of the inspection. It was noted that additional straw bales will <br /> need to be placed or the existing straw bales will need to be replaced around the boundary of the pump <br /> house pad. <br /> 1' 1i <br /> .5 <br /> DK-1 Clean out DJ-3 Cleanout <br /> PROCESSING WASTE/COAL MINE WASTE PILES—Rule 4.10 and 4.11 Drainage Control; Surface <br /> Stabilization;Placement: <br /> Due to the idle condition of the site, gob placement will be minimal moving forward. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 4 of 9 <br />