March 22,2016 C-1996-083/13owie No. 2 Mine JDM <br /> Reclamation of the west side of Gob Pile#4 is completed. Cover material is placed on the three lower benches <br /> that have been backfilled and graded to final configuration. The upper bench remains open for additional refuse <br /> placement. Topsoil has been placed and erosion control mat is in place. <br /> ROADS—Rule 4.03 Construction 4.03.1(3)/4.03.2(3)Drainage 4.03.1(4)/4.03.2(4)Surfacing and Maintenance <br /> 4.03.1(5) and(6)14.03.2(5) and(6)Reclamation 4.03.1(7)14.03.2(7): <br /> All roads in and around the facilities area and off-site locations were dry and stable with no problems noted. As <br /> noted in the Hydrologic Balance section of this report,roadside ditches and culverts have been cleaned and were <br /> functioning as designed at the time of the inspection. <br /> SUPPORT FACILITIES-Rule 4.04: <br /> The Terror Creek Vent Shaft area was stable with no problems noted at the time of the inspection. <br /> Conveyor rollers and belt was being removed at the Portal B bench and placed on the pad at the time of the <br /> inspection. It was noted by Bill Bear of BRL that the materials will be removed and sent to operations in Utah. <br /> No issues were noted. <br /> Terror Creek Vent Shaft Drainage Terror Creek Vent Shaft <br /> - - �.tea � , �� t,d'*k ■� �. <br /> 3 <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 6 of 9 <br />