Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 43 of 47 <br />CIRCES Cost Estimating Software <br />8ft. Wx10ft. H <br />housing <br />Conveyor - Sample <br />120 LF <br />Conveyor, elevated, <br />120.00 <br />LF <br />$53.42 <br />$6,410.40 <br />Building to Stacker Tube <br />including supports - <br />8 ft. W x 10 ft. H <br />housing <br />Conveyor - Washplant <br />740 LF <br />Conveyor, elevated, <br />740.00 <br />LF <br />$44.51 <br />$32,936.66 <br />Feed <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Conveyor - Coal Refuse <br />270 LF <br />Conveyor, elevated, <br />270.00 <br />LF <br />$44.51 <br />$12,017.43 <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Conveyor - <br />950 LF <br />Conveyor, elevated, <br />950.00 <br />LF <br />$44.51 <br />$42,283.55 <br />Crushing/Screening Feed <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Conveyor - Washplant II <br />50 LF <br />Conveyor, elevated, <br />50.00 <br />LF <br />$44.51 <br />$2,225.45 <br />Stoker Feeder <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Conveyor - Washplant II <br />190 LF <br />Conveyor, elevated, <br />190.00 <br />LF <br />$44.51 <br />$8,456.71 <br />Stoker Transfer <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Conveyor - Washplant II <br />20 LF <br />Conveyor, elevated, <br />20.00 <br />LF <br />$44.51 <br />$890.18 <br />Stoker Loading <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Culvert - E2B and E2C <br />25 LF (2) <br />Pipe, corrugated <br />50.00 <br />LF <br />$3.07 <br />$153.50 <br />metal (CMP) - 21 <br />in. diameter pipe <br />Culvert - E21) and E2E <br />70 LF(2) <br />Pipe, corrugated <br />140.00 <br />LF <br />$3.07 <br />$429.80 <br />metal (CMP) - 21 <br />in. diameter i e <br />Culvert - Foidel Creek <br />75 LF (6) <br />Pipe, corrugated <br />450.00 <br />LF <br />$4.98 <br />$2,241.00 <br />Crossing <br />metal (CMP) - 36 <br />in. diameter pipe <br />Culvert - Materials Storage <br />50 LF (2) <br />Pipe, corrugated <br />100.00 <br />LF <br />$2.30 <br />$230.00 <br />Yard <br />metal (CMP) - 12 <br />in. diameter pipe <br />Culvert - Haul Road B <br />125 LF <br />Pipe, corrugated <br />125.00 <br />LF <br />$4.98 <br />$622.50 <br />metal (CMP) - 36 <br />in. diameter pipe <br />Culvert - Material Storage <br />75 LF <br />Pipe, corrugated <br />75.00 <br />LF <br />$2.46 <br />$184.50 <br />Access Road <br />metal (CMP) - 18 <br />in. diameter pipe <br />Culvert - Lab Area <br />50 LF (2) <br />Pipe, corrugated <br />100.00 <br />LF <br />$1.74 <br />$174.00 <br />metal (CMP) - 8 <br />in. diameter pipe <br />Culvert - Lab Area <br />50 LF (3) <br />Pipe, corrugated <br />150.00 <br />LF <br />$2.30 <br />$345.00 <br />metal (CMP) - 12 <br />in. diameter pipe <br />Culvert - Truck Loadout <br />50 LF <br />Pipe, corrugated <br />50.00 <br />LF <br />$4.40 <br />$220.00 <br />metal (CMP) - 27 <br />in. diameter pipe <br />CIRCES Cost Estimating Software <br />