My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-10_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2016-03-10_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:59 PM
Creation date
3/11/2016 7:25:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
3/10/2016
Doc Name
Letter Confirming the Informal Conference date and time
From
DRMS
To
Twentymile Coal, LLC
Type & Sequence
SI2
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT <br />Page 42 of 47 <br />Conveyor - Train Loadout <br />520 LF <br />Conveyor, elevated, <br />520.00 <br />LF <br />$44.51 <br />$23,144.68 <br />Stacking <br />including supports - <br />Sft.Wx 6ft.H <br />housing <br />Conveyor - Cross <br />69 LF <br />Conveyor, overland, <br />69.00 <br />LF <br />$17.60 <br />$1,214.40 <br />including supports - <br />Sft.Wx 6ft.H <br />housing <br />Conveyor - Mine Slope <br />290 LF <br />Conveyor, overland, <br />290.00 <br />LF <br />$26.71 <br />$7,745.90 <br />including supports - <br />8 ft. W x 10 ft. H <br />housing <br />Conveyor - Waste Rock <br />275 LF <br />Conveyor, elevated, <br />275.00 <br />LF <br />$53.42 <br />$14,690.50 <br />Stacking Tube <br />including supports - <br />8 ft. W x 10 ft. H <br />housing <br />Conveyor - Transfer <br />185 LF <br />Conveyor, elevated, <br />185.00 <br />LF <br />$53.42 <br />$9,882.70 <br />Building #1 to #2 <br />including supports - <br />8 ft. W x 10 ft. H <br />housing <br />Conveyor - Transfer <br />185 LF <br />Conveyor, elevated, <br />185.00 <br />LF <br />$53.42 <br />$9,882.70 <br />Building to T and D Tower <br />including supports - <br />8 ft. W x 10 ft. H <br />housing <br />Conveyor - Main Tunnel <br />250 LF <br />Conveyor, overland, <br />250.00 <br />LF <br />$26.71 <br />$6,677.50 <br />including supports - <br />8 ft. W x 10 ft. H <br />housing <br />Conveyor - Tunnel <br />480 LF <br />Conveyor, overland, <br />480.00 <br />LF <br />$26.71 <br />$12,820.80 <br />Laterals <br />including supports - <br />8 ft. W x 10 ft. H <br />housing <br />Conveyor - BOB Overland <br />3910 LF <br />Conveyor, overland, <br />3,910.00 <br />LF <br />$17.60 <br />$68,816.00 <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Conveyor - BOB Elevated <br />290 LF <br />Conveyor, elevated, <br />290.00 <br />LF <br />$44.51 <br />$12,907.61 <br />including supports - <br />Sft.Wx 6ft.H <br />housing <br />Conveyor - Drive Building <br />30 LF <br />Conveyor, elevated, <br />30.00 <br />LF <br />$53.42 <br />$1,602.60 <br />to Crusher <br />including supports - <br />8 ft. W x 10 ft. H <br />housing <br />Conveyor - Primary <br />135 LF <br />Conveyor, elevated, <br />135.00 <br />LF <br />$53.42 <br />$7,211.70 <br />Crusher to 2nd Crusher <br />including supports - <br />8 ft. W x 10 ft. H <br />housing <br />Conveyor - Truck Dump to <br />100 LF <br />Conveyor, elevated, <br />100.00 <br />LF <br />$53.42 <br />$5,342.00 <br />Drive Building <br />including supports - <br />8 ft. W x 10 ft. H <br />housing <br />Conveyor - Stoker <br />100 LF <br />Conveyor, elevated, <br />100.00 <br />LF <br />$53.42 <br />$5,342.00 <br />Stockpile <br />including supports - <br />8 ft. W x 10 ft. H <br />housing <br />Conveyor - 2nd Crusher to <br />90 LF <br />Conveyor, elevated, <br />90.00 <br />LF <br />$53.42 <br />$4,807.80 <br />Sample Building <br />including supports - <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.