Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 41 of 47 <br />CIRCES Cost Estimating Software <br />average reinforcing <br />- 18 in. thick <br />Coal Refuse Bin Protective <br />10'X4'dia <br />Metal bin retaining <br />40.00 <br />SF <br />$2.52 <br />$100.80 <br />Structure <br />wall, 10' wide, 4-12' <br />high <br />15 LT Shaft Rock Dust <br />4560 CF <br />Bldg. (MN) <br />4,560.00 <br />CF <br />$0.22 <br />$980.40 <br />Tank <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />15 LT Shaft Rock Dust <br />5'X5' <br />Demo. and on-site <br />25.00 <br />SF <br />$2.13 <br />$53.20 <br />Tank Pad <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 50 ft. push <br />15 LT Shaft Rock Dust <br />2'X26' <br />Demo. and on-site <br />104.00 <br />LF <br />$12.77 <br />$1,327.98 <br />Tank Piers <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 50 ft. ush <br />15 LT Shaft Pad <br />770'X2' <br />Pavement, concrete, <br />57.00 <br />CY <br />$124.50 <br />$7,096.50 <br />demolition only, 7 <br />in. to 24 in. thick - <br />Reinforced <br />15 LT Shaft Surface <br />7'X8'X6' <br />Demo. and on-site <br />131.00 <br />SF <br />$1.48 <br />$193.88 <br />Casing <br />disposal in existing <br />pit, 8 in. thick - <br />Max. 10,000 ft. haul <br />15 LT Shaft Powerlines <br />9550 LF <br />Powerline or <br />9,550.00 <br />LF <br />$2.68 <br />$25,594.00 <br />telephone line, <br />overhead, wood - <br />Sin le pole <br />15 LT Shaft Fencing <br />144'X240' <br />Fencing, chain link, <br />384.00 <br />LF <br />$3.05 <br />$1,171.20 <br />including posts and <br />fabric - 8 ft. to 10 ft. <br />high <br />Conveyor - Clean Coal <br />164 LF <br />Conveyor, elevated, <br />164.00 <br />LF <br />$44.51 <br />$7,299.48 <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Conveyor - Stoker Truck <br />291 LF <br />Conveyor, elevated, <br />291.00 <br />LF <br />$44.51 <br />$12,952.12 <br />Loadout <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Conveyor - Plant Feed <br />222 LF <br />Conveyor, elevated, <br />222.00 <br />LF <br />$44.51 <br />$9,881.00 <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Conveyor - Refuse <br />222 LF <br />Conveyor, elevated, <br />222.00 <br />LF <br />$44.51 <br />$9,881.00 <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Conveyor - Transfer Chute <br />128 LF <br />Conveyor, overland, <br />128.00 <br />LF <br />$17.60 <br />$2,252.80 <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />Conveyor - Transfer Belt <br />71 LF <br />Conveyor, elevated, <br />71.00 <br />LF <br />$44.51 <br />$3,160.14 <br />including supports - <br />5ft.Wx 6ft.H <br />housing <br />CIRCES Cost Estimating Software <br />