Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 44 of 47 <br />Culvert - Haul Road B <br />50 LF <br />Pipe, corrugated <br />50.00 <br />LF <br />$2.30 <br />$115.00 <br />Location C <br />metal (CMP) - 12 <br />in. diameter i e <br />Culvert - D3B <br />50 LF (6) <br />Pipe, corrugated <br />300.00 <br />LF <br />$4.98 <br />$1,494.00 <br />metal (CMP) - 36 <br />in. diameter pipe <br />Culvert - E2A <br />25 LF <br />Pipe, corrugated <br />25.00 <br />LF <br />$1.77 <br />$44.25 <br />metal (CMP) - 10 <br />in. diameter pipe <br />Culvert - E2A <br />50 LF <br />Pipe, corrugated <br />50.00 <br />LF <br />$2.37 <br />$118.50 <br />metal (CMP) - 15 <br />in. diameter pipe <br />Culvert - Wastewater <br />25 LF (2) <br />Pipe, corrugated <br />50.00 <br />LF <br />$2.46 <br />$123.00 <br />Treatment Pond Access <br />metal (CMP) - 18 <br />Road <br />in. diameter pipe <br />Culvert - D3 <br />60 LF <br />Pipe, corrugated <br />60.00 <br />LF <br />$6.24 <br />$374.40 <br />metal (CMP) - 48 <br />in. diameter i e <br />Culvert - Explosives Area <br />160 LF <br />Pipe, corrugated <br />160.00 <br />LF <br />$2.46 <br />$393.60 <br />Access Road <br />metal (CMP) - 18 <br />in. diameter i e <br />Culvert- Westside <br />40 LF (2) <br />Pipe, corrugated <br />80.00 <br />LF <br />$2.30 <br />$184.00 <br />Explosives Area <br />metal (CMP) - 12 <br />in. diameter pipe <br />Culvert - D1A <br />50 LF <br />Pipe, corrugated <br />50.00 <br />LF <br />$3.27 <br />$163.50 <br />metal (CMP) - 24 <br />in. diameter pipe <br />Culvert - DIB <br />40 LF <br />Pipe, corrugated <br />40.00 <br />LF <br />$3.27 <br />$130.80 <br />metal (CMP) - 24 <br />in. diameter i e <br />Culvert - D1C <br />250 LF <br />Pipe, corrugated <br />250.00 <br />LF <br />$3.27 <br />$817.50 <br />metal (CMP) - 24 <br />in. diameter pipe <br />Culvert - D1D <br />40 LF <br />Pipe, corrugated <br />40.00 <br />LF <br />$4.98 <br />$199.20 <br />metal (CMP) - 36 <br />in. diameter pipe <br />Culvert - D1C(A) <br />50 LF <br />Pipe, corrugated <br />50.00 <br />LF <br />$3.27 <br />$163.50 <br />metal (CMP) - 24 <br />in. diameter pipe <br />Culvert - BOB to Pond B <br />25 LF (2) <br />Pipe, corrugated <br />50.00 <br />LF <br />$2.46 <br />$123.00 <br />metal (CMP) - 18 <br />in. diameter pipe <br />Culvert - Train Tunnel To <br />30 LF <br />Pipe, corrugated <br />30.00 <br />LF <br />$3.27 <br />$98.10 <br />Pond B <br />metal (CMP) - 24 <br />in. diameter pipe <br />Culvert - BOB Area <br />40 LF (3) <br />Pipe, corrugated <br />120.00 <br />LF <br />$2.30 <br />$276.00 <br />metal (CMP) - 12 <br />in. diameter pipe <br />Culvert - BOB Area <br />40 LF <br />Pipe, corrugated <br />40.00 <br />LF <br />$1.74 <br />$69.60 <br />metal (CMP) - 8 <br />in. diameter pipe <br />Culvert - Train Loadout <br />75 LF <br />Pipe, corrugated <br />75.00 <br />LF <br />$2.30 <br />$172.50 <br />Area <br />metal (CMP) - 12 <br />in. diameter pipe <br />Culvert - BOB at <br />60 LF <br />Pipe, corrugated <br />60.00 <br />LF <br />$2.46 <br />$147.60 <br />Conveyor <br />metal (CMP) - 18 <br />in. diameter pipe <br />CIRCES Cost Estimating Software <br />