Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 21 of 47 <br />CIRCES Cost Estimating Software <br />pit, 10 in. thick - <br />Max. 200 ft. push <br />MCC -2 Control Building <br />16'X12X13' <br />Bldg. (MN) <br />2,496.00 <br />CF <br />$0.20 <br />$509.18 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />MCC -2 Control Building <br />16'X12' <br />Demo. and on-site <br />192.00 <br />SF <br />$1.08 <br />$207.17 <br />Floor <br />disposal in existing <br />pit, 6 in. thick - <br />Max. 200 ft. push <br />MCC -2 Control Building <br />60 LF <br />Demo. and on-site <br />60.00 <br />LF <br />$12.95 <br />$776.94 <br />Footers <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 200 ft. push <br />Primary Crusher Building <br />54'X27'X48' <br />Bldg. (MN) <br />69,984.00 <br />CF <br />$0.20 <br />$14,276.74 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Primary Crusher Building <br />54'X27' <br />Demo. and on-site <br />1,458.00 <br />SF <br />$1.48 <br />$2,157.84 <br />Floor <br />disposal in existing <br />pit, 8 in. thick - <br />Max. 200 ft. push <br />Primary Crusher Building <br />162 LF <br />Demo. and on-site <br />162.00 <br />LF <br />$12.95 <br />$2,097.74 <br />Footers <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 200 ft. push <br />Secondary Crusher <br />42'X42'X68' <br />Bldg. (MN) <br />119,952.00 <br />CF <br />$0.20 <br />$24,470.21 <br />Building <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Secondary Crusher <br />42'X42' <br />Demo. and on-site <br />1,764.00 <br />SF <br />$1.48 <br />$2,610.72 <br />Building Floor <br />disposal in existing <br />pit, 8 in. thick - <br />Max. 200 ft. push <br />Secondary Crusher <br />158 LF <br />Demo. and on-site <br />158.00 <br />LF <br />$12.95 <br />$2,045.94 <br />Building Footers <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 200 ft. push <br />Truck Dump Conveyor <br />10'X20'X20' <br />Bldg. (MN) <br />4,000.00 <br />CF <br />$0.20 <br />$816.00 <br />Drive Building <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Truck Dump Conveyor <br />20'X20' <br />Demo. and on-site <br />400.00 <br />SF <br />$1.48 <br />$592.00 <br />Drive Building Floor <br />disposal in existing <br />pit, 8 in. thick - <br />Max. 200 ft. push <br />Truck Dump Conveyor <br />80 LF <br />Demo. and on-site <br />80.00 <br />LF <br />$6.48 <br />$518.00 <br />Drive Building Footers <br />disposal in existing <br />pit, 1.5 ft. x 2 ft. - <br />Max. 200 ft. push <br />Truck Dump Hopper Roof <br />30'X30'X1' <br />Demo. and on-site <br />900.00 <br />SF <br />$2.16 <br />$1,942.20 <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />CIRCES Cost Estimating Software <br />