Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 22 of 47 <br />Truck Dump Hopper Wall <br />40'X15'X1' (2) <br />Demo. and on-site <br />1,200.00 <br />SF <br />$2.29 <br />$2,742.00 <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />Truck Dump Hopper Floor <br />40'X30'X1' <br />Demo. and on-site <br />1,200.00 <br />SF <br />$2.16 <br />$2,589.60 <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />Stoker Pile Structure <br />15'X10'X20' <br />Bldg. (MN) <br />3,000.00 <br />CF <br />$0.20 <br />$612.00 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Stoker Pile Structure <br />15'X10' <br />Demo. and on-site <br />150.00 <br />SF <br />$2.16 <br />$323.70 <br />Foundation <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />12,000G Surface Tank <br />2000 CF <br />Bldg. (MN) <br />2,000.00 <br />CF <br />$0.20 <br />$408.00 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />12,000G Surface Tank <br />140 SF <br />Demo. and on-site <br />140.00 <br />SF <br />$1.14 <br />$159.88 <br />Containment <br />disposal in existing <br />pit, 6 in. thick - <br />Max. 200 ft. push <br />Sampler Building <br />50'X27'X55' <br />Bldg. (MN) <br />74,250.00 <br />CF <br />$0.20 <br />$15,147.00 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Sampler Building Floor <br />50'X27' <br />Demo. and on-site <br />1,350.00 <br />SF <br />$1.48 <br />$1,998.00 <br />disposal in existing <br />pit, 8 in. thick - <br />Max. 200 ft. push <br />Sampler Building Footers <br />172 LF <br />Demo. and on-site <br />172.00 <br />LF <br />$12.95 <br />$2,227.23 <br />disposal in existing <br />pit, 2.0 ft. x 3 ft. - <br />Max. 200 ft. push <br />Stacker Tube <br />177'X110'X15'dia <br />Bldg. (MN) <br />19,437.00 <br />CF <br />$0.20 <br />$3,965.15 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Stacker Tube Foundation <br />30'X30'X1' <br />Demo. and on-site <br />900.00 <br />SF <br />$2.16 <br />$1,942.20 <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />Stacker Tube Tunnel <br />537'X20' <br />Demo. and on-site <br />10,740.00 <br />SF <br />$2.29 <br />$24,540.90 <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />Tipple Substation <br />30'X30'X10' <br />Bldg. (MN) <br />9,000.00 <br />CF <br />$0.20 <br />$1,836.00 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Tipple Substation <br />30'X10' <br />Demo. and on-site <br />300.00 <br />SF <br />$1.08 <br />$323.70 <br />Foundations <br />disposal in existing <br />CIRCES Cost Estimating Software <br />