Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 20 of 47 <br />CIRCES Cost Estimating Software <br />disposal in existing <br />pit or cut - Max. 50 <br />ft. push <br />MCC -1 Building Floor <br />10'X8' <br />Demo. and on-site <br />80.00 <br />SF <br />$1.06 <br />$85.12 <br />disposal in existing <br />pit, 6 in. thick - <br />Max. 50 ft. push <br />Zero Entry Fan Housing <br />951X181X10' <br />Bldg. (MN) <br />17,100.00 <br />CF <br />$0.20 <br />$3,488.40 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Fresh Water Tank <br />314'X30'X20'dia <br />Bldg. (MN) <br />9,423.00 <br />CF <br />$0.22 <br />$2,025.95 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Fresh Water Tank <br />314'X1' <br />Demo. and on-site <br />314.00 <br />SF <br />$2.22 <br />$697.08 <br />Foudation <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 10,000 ft. haul <br />20,000G Water Tank <br />2674 CF <br />Bldg. (MN) <br />2,674.00 <br />CF <br />$0.20 <br />$545.50 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />20,000G Water Tank Pad <br />25'X14' <br />Demo. and on-site <br />350.00 <br />SF <br />$2.16 <br />$755.30 <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 200 ft. push <br />20,000G Water Tank <br />1966 CF <br />Bldg. (MN) <br />1,966.00 <br />CF <br />$0.20 <br />$401.06 <br />Canopy <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Well House <br />20'X20'X10' <br />Bldg. (MN) <br />4,000.00 <br />CF <br />$0.20 <br />$792.00 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 50 <br />ft. push <br />Well House Floor <br />20'X20' <br />Demo. and on-site <br />400.00 <br />SF <br />$1.42 <br />$567.60 <br />disposal in existing <br />pit, 8 in. thick - <br />Max. 50 ft. push <br />Well House Footers <br />80 LF <br />Demo. and on-site <br />80.00 <br />LF <br />$4.26 <br />$340.48 <br />disposal in existing <br />pit, 1.0 ft. x 2 ft. - <br />Max. 50 ft. ush <br />BOB Overland Conveyor <br />40'X28'X30' <br />Bldg. (MN) <br />33,600.00 <br />CF <br />$0.20 <br />$6,854.40 <br />Drive Building <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />BOB Overland Conveyor <br />40'X28' <br />Demo. and on-site <br />1,120.00 <br />SF <br />$1.08 <br />$1,208.48 <br />Drive Building Floor <br />disposal in existing <br />pit, 6 in. thick - <br />Max. 200 ft. push <br />BOB Overland Conveyor <br />544 SF <br />Demo. and on-site <br />544.00 <br />SF <br />$1.90 <br />$1,035.78 <br />Drive Building Stem Wall <br />disposal in existing <br />CIRCES Cost Estimating Software <br />