Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 19 of 47 <br />Conveyor Waste Rock <br />15'XIYX35' <br />Bldg. (MN) <br />7,875.00 <br />CF <br />$0.20 <br />$1,559.25 <br />Discharge Structure <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 50 <br />ft. push <br />Conveyor Waste Rock <br />15'X15' <br />Demo. and on-site <br />225.00 <br />SF <br />$2.13 <br />$478.80 <br />Structure Foundation <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 50 ft. push <br />Conveyor Transfer <br />40'X35X35' <br />Bldg. (MN) <br />49,000.00 <br />CF <br />$0.20 <br />$9,702.00 <br />Building #2 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 50 <br />ft. push <br />Conveyor Discharge <br />10'X10'X25' <br />Bldg. (MN) <br />2,500.00 <br />CF <br />$0.20 <br />$495.00 <br />Structure <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 50 <br />ft. push <br />Conveyor Transfer <br />30'X30'X35' <br />Bldg. (MN) <br />31,500.00 <br />CF <br />$0.20 <br />$6,237.00 <br />Building #3 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 50 <br />ft. push <br />Stacking Tube <br />50'X60'X8'dia <br />Bldg. (MN) <br />3,015.00 <br />CF <br />$0.20 <br />$596.97 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 50 <br />ft. push <br />Stacking Tube Foundation <br />12'X12'X3' <br />Demo. and on-site <br />432.00 <br />SF <br />$2.13 <br />$919.30 <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 50 ft. push <br />Portal Tunnel Face Up <br />110'X15'Xl' <br />Demo. and on-site <br />1,650.00 <br />SF <br />$2.26 <br />$3,720.75 <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 50 ft. push <br />1,414.00 <br />CF <br />Portal tunnel <br />28'X50'X6'dia <br />Bldg. (MN) <br />$0.20 <br />$279.97 <br />EscapewayNent <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 50 <br />ft. push <br />Portal Tunnel Feeder Unit <br />36'X10'X3'X3' <br />Bldg. (MN) <br />3,240.00 <br />CF <br />$0.20 <br />$660.96 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Portal Heater and Fuel <br />5076 CF <br />Bldg. (MN) <br />5,076.00 <br />CF <br />$0.20 <br />$1,035.50 <br />Tanks <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />Portal Slope Heating Shed <br />7'X7'X15' <br />Bldg. (MN) <br />735.00 <br />CF <br />$0.20 <br />$149.94 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 200 <br />ft. push <br />MCC -1 Building <br />10'X8'X10' <br />Bldg. (MN) <br />800.00 <br />CF <br />$0.20 <br />$158.40 <br />demo./on-site <br />CIRCES Cost Estimating Software <br />