Laserfiche WebLink
March 2,2016 C-1982-056/Foidel Creek Mine JLE <br /> Figure 4. Berm at base of coal stockpile. <br /> Figure 5. Coal Stockpile that feeds train loadout. <br /> The original refuse disposal area was observed. Snow has been melting on the pile but the majority of the pile is <br /> still covered. Some rills were visible on the pile and should be monitored and possibly addressed when conditions <br /> allow. <br /> TC continues to place coal refuse on the second bench of the expansion area. The first and second bench faces of <br /> the embankment was snow covered but appeared stable. Water was discharging from the seep and the toe drain of <br /> the refuse pile. <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 6 of 11 <br />