Laserfiche WebLink
March 2,2016 C-1982-056/Foidel Creek Mine JLE <br /> The Area 1 Pond was not discharging to Pond D at the time of the inspection. <br /> Pond D is snow and ice covered and did not appear to be discharging. The embankment was stable and snow <br /> covered. <br /> Pond F is snow and ice covered. The pond was not discharging. The embankment was snow covered but <br /> appeared stable. <br /> Pond G is snow and ice covered. The pond was not discharging. The embankment was snow covered but <br /> appeared stable. <br /> Maintenance Item: <br /> A pallet of rock dust is stored at the train loadout. Several of the bags have been damaged and rock dust is <br /> exposed to the elements. In accordance with Rule 4.05.1(4),please move, cover and store this material in <br /> such a way as to prevent it from affecting the hydrologic balance. <br /> F - <br /> Figure 2. Rock dust bags stored near the trail loadout. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The ROM coal stockpile,the coal stockpile that feeds the train loadout and the BOB pile was active at the time of <br /> the inspection. <br /> At the time of the inspection, TC was completing the longwall move from the 13 LT panel to the 12 LT panel in <br /> the Wadge seam in the Western Mining District. TC is also conducting continuous mining at the 10 East Gate <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 4 of 11 <br />