My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-28_REVISION - M1987049
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987049
>
2009-08-28_REVISION - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:24:52 PM
Creation date
2/17/2016 12:19:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REVISION
Doc Date
8/28/2009
Doc Name
Adequacy Review Response- Approved Substitute water supply plan AR02
From
Hart Environmental
To
DRMS
Type & Sequence
AR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br />Ready Mixed - Kenneth Mitchell Lake Storage <br />SWSP Projected Replacements (August 2009 through July 2010) <br />all values in acre-feet <br />Month <br />Total <br />Replacement <br />Requirement <br />[1] <br />Total <br />Fulton HCU <br />Direct <br />To River <br />[2] <br />Total <br />Surplus <br />Fulton <br />HCU <br />[3] <br />Total Surplus <br />Fulton HCU <br />Delivered <br />To Storage <br />[4] <br />Total Surplus <br />Fulton HCU <br />Delivered <br />To River <br />[5] <br />Releases from <br />Storage to River <br />RMCC's <br />Ken <br />Mitchell <br />Evaporation <br />[8] <br />RMCC's <br />EOM Ken <br />Mitchell <br />Storage <br />[9] <br />Brighton <br />Lease <br />Replacement <br />[10l <br />Remaining <br />Replacement <br />Requirement <br />[11] <br />Required <br />[6] <br />Actual <br />[71 <br />Aug <br />25.6 <br />25.6 <br />6.3 <br />6.3 <br />0 <br />0 <br />0 <br />5.8 <br />126.5 <br />0 <br />0 <br />Sep <br />25.5 <br />14.9 <br />0 <br />0 <br />0 <br />10.7 <br />10.7 <br />4.4 <br />111.5 <br />0 <br />0 <br />Oct <br />23.1 <br />2.1 <br />0 <br />0 <br />0 <br />21.0 <br />21.0 <br />2.8 <br />87.6 <br />0 <br />0 <br />Nov <br />26.3 <br />0 <br />0 <br />0 <br />0 <br />26.3 <br />26.3 <br />1.3 <br />60.0 <br />0 <br />0 <br />Dec '09 <br />22.5 <br />0 <br />0 <br />0 <br />0 <br />22.5 <br />22.5 <br />0.9 <br />36.6 <br />0 <br />0 <br />Jan'10 <br />17.9 <br />0 <br />0 <br />0 <br />0 <br />17.9 <br />17.9 <br />1.3 <br />17.4 <br />0 <br />0 <br />Feb <br />16.2 <br />0 <br />0 <br />0 <br />0 <br />16.2 <br />16.2 <br />1.2 <br />0 <br />0 <br />0 <br />Mar <br />14.1 <br />0 <br />0 <br />0 <br />0 <br />14.1 <br />0 <br />0 <br />0 <br />14.1 <br />0 <br />Apr <br />13.1 <br />4.2 <br />0 <br />0 <br />0 <br />8.8 <br />0 <br />0 <br />0 <br />8.8 <br />0 <br />May <br />16.9 <br />16.9 <br />4.3 <br />4.3 <br />0 <br />0 <br />0 <br />0 <br />4.3 <br />0 <br />0 <br />Jun <br />21.4 <br />21.4 <br />10.5 <br />10.5 <br />0 <br />0 <br />0 <br />5.3 <br />9.5 <br />0 <br />0 <br />Jul <br />23.8 <br />23.8 <br />16.6 <br />16.6 <br />0 <br />0 <br />0 <br />8.1 <br />18.0 <br />0 <br />0 <br />09-I0 Total <br />246.3 <br />108.9 <br />37.7 <br />37.7 <br />- <br />137.5 <br />114.6 <br />31.1 <br />- <br />22.9 <br />0 <br />NTP - North Tower Pit, BL - Bromley Lakes Pit, RMP1 - Ready Mixed Pit 1 <br />[1] Total replacement requirement, equal to NTP Col [9] + BL Col [ 14] + RMP1 Col [11]. <br />[2] Total Fulton water credited to the river, equal to NTP Col [10] + BL Col [15] + RMPI Col [12]. <br />[3] Total Surplus Fulton Credits available. Equal to BL Col [17] + the greater of zero and RMP1 Col [10] - RMP1 Col [12]. <br />[4] Total Surplus Fulton HCU Delivered to Storage as reported by RMCC. <br />[5] Total Surplus Fulton HCU Delivered to River is the excess Fulton credits that were delivered to the River and not stored (+) or the over storage of Fulton credits (-). <br />Equal to [3] - [2]. <br />[6] Required Releases from storage to the River for all pits. Equal to the sum of the replacement requirement for all three pits minus the total Fulton water credited directly <br />to the river, [1] - [2]. <br />[7] Actual Releases of RMCC water from Kenneth Mitchell Lake Storage to the River or another replacement release as reported by the City of Brighton. <br />[8] RMCC's portion of the Ken Mitchell Lake evaporation, estimated based upon storage projections provided by the City of Brighton. <br />[9] RMCC's cumulative storage in Brighton's Kenneth Mitchell Lake I, equal to previous [9] + [4] - [7] - [8]. <br />[ 10] RMCC's lease of excess augmentation credits from the City of Brighton. <br />[11] Total Remaining Replacement Requirement for all three pits. Equal to NTP [14] + BL [19] + RMPI [15]. <br />1/1/1.111 tf.1141/H X0430 - Bor 0BromleyWTP&BL SWSP renewal 6-9-09 an l Ergot's <br />
The URL can be used to link to this page
Your browser does not support the video tag.